My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30649
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30649
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:08 PM
Creation date
11/23/2007 6:46:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
General Documents
Doc Date
6/7/1991
Doc Name
Proposed Decision & Findings of Compliance for PR3
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Decision <br />The Colorado Mined Land Reclamation Division proposes to approve, with <br />stipulations, an application for a permit revision. The application was <br />submitted by National Kinq Coal, for the Kinq Coal Mine. This approval <br />decision is based on a finding that the proposed operation will comply all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, C.R.S. <br />34-33-101, et sea., and the regulations promulgated thereunder. If no request <br />for a formal hearing is made within thirty (30) days of the first publication <br />of the issuance of this proposed decision, then this decision becomes final. <br />The permit application, all supporting documentation and any stipulations or <br />conditions will become a binding part of the permit. <br />List of Stipulations resulting from this Permit Revision application: <br />Stipulation No. O8: <br />WITHIN 60 DAYS OF APPROVAL OF PERMIT REVISION 03, NATIONAL KING COAL WILL <br />SUBMIT A PLAN IN THE FORM OF A TECHNICAL REVISION TO THE PERMIT THAT <br />SHALL INCLUDE CHANGES TO THE PRIMARY AND EMERGENCY SPILLWAYS OF EACH POND <br />AND INCORPORATE ROUTING CHANGES TO THE EAST DRAINAGE DITCH. THE PLAN <br />SHALL COMPLY WITH THE APPLICABLE PORTIONS OF RULES 4.05.4, 4.05.5, <br />4.05.6, 4.05.7, AND 4.05.9. <br />Stipulation No. 09: <br />WITHIN 60 DAYS OF APPROVAL OF PERMIT REUISION 03, NATIONAL KING COAL WILL <br />SUBMIT IN THE FORM OF A MINOR REVISION TO THE PERMIT A FINAL RECLAMATION <br />PHASE SEED MIXTURE WHICH INCLUDES BOTH WARM AND COOL SEASON GRASSES. THE <br />MIXTURE SHALL COMPLY WITH THE APPLICABLE PORTIONS OF RULES 4.15.2 AND <br />4.15.8. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.