Laserfiche WebLink
Serial No.p-044569 <br />CONTROLLED SURFACE USE STIPULATION <br />SLOPES 40-600 <br />Surface occupancy or use is subject to the following special operating <br />constraints. <br />Special inter-disciplinary team analysis and mitigation plans detailing <br />construction and mitigation techniques will be required on areas with <br />slopes ranginc from 40-60%. (Inter-disciplinary team disciplines could <br />include engineering, soil scientist, hydrologist, landscape architect, <br />reclamation specialist and minerals specialist.? <br />On lands described below: <br />All or portions of Sec.21,T.13S,R.90W, 6th PM as shown on the attached map <br />prepared by Michael K. Ward on 12-20-93, which becomes a part hereof. Any <br />area within the leasehold which has slopes ranging from 40-60% falls under <br />Jurisdiction of this stipulation. <br />For the purpose of: <br />Minimizing potential for soil loss, mass land movement, revegetation <br />failure and unacceptable visual impairment. <br />Any changes to this stipulation will be made in accordance with the land use;-, <br />plan and/or the regulatory provisions for such changes. <br />ri <br />~)" <br />~.. <br />i~' <br />