Laserfiche WebLink
<br />Ricnartl D. Lamm <br />Governor <br />July 6, 1983 <br />Mr, Robert H. Sherman <br />The Rockcastle Company <br />P.U. Box AA <br />Hayden, Colorado 81b39 <br />RE: Pit #4 Haul Road Certification <br />Dear Mr. Sherman: <br /> <br />Your request for an extension for submitting certification of final <br />construction on the Pit 4 haul road, is reasonable given the <br />circumstances described in your letter of June 21, 1983. <br />However, the August 31, 1981 technical revision approval stipulated that <br />the design engineer conduct periodic inspections during construction of <br />the haul road. A report completed by the design engineer (Mr. Michael L. <br />Brown, Hydro Triad Ltd.) verifying that the construction completed to <br />date has been in conformance with the approved design and assumptions of <br />tlhe;stability analysis should be submitted to the Division by July 29, <br />8 <br />Given the status of mining at Grassy Creek no specific date will be <br />established as a deadline for submittal of final road certification. <br />Certification will be required as soon as practical following completion <br />o.f road construction. A deadline may be established by the Division in <br />the future, upon resumption of mining in Pit 4. <br />Sincerely, <br />.~~ ~~`~ . <br />Dan Mathews <br />Reclamation Spec ialist <br />DM/ep <br />Uoc. No. 4121 <br />DEPAR7MENTOFNATURALRESOURCES. <br />0 Monle Pascoe. E.ecwwe D~~ecl o, <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />' ti/r~~,~,~~ C~ . <br />