Laserfiche WebLink
-5- <br />Stipulation No: 1 <br />THE APPLICANT SHALL CONTINUE TO SUBMIT TO THE DIVISION AN ANNUAL REPORT <br />OF INFLOWS, DISCHARGES AND CONSUMPTION OF WATER WITHIN THE MINE. THIS <br />REPORT IS TO INCLUDE A WORKINGS MAP SHOWING THE LOCATION AND QUANTITY OF <br />INFLOWS; A TABLE KEYED TO THE MINE MAP WHICH SHALL CONTAIN THE SOURCE <br />(i.e., FAULT, FRACTURES, ETC.) QUANTITY, DURATION, AND QUALITY <br />(i.e., pH, ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL INFLOWS; A TABLE <br />CONTAINING RECORDS OF WATER DISCHARGED FROM THE MINE, CONSUMED IN THE <br />MINE AND IMPORTED FOR USE WITHIN THE MINE. <br />Stipulation No. 2 <br />BEAR COAL COMPANY SHALL CONTINUE TO MONITOR THE THREE NORTH FORK <br />ALLUVIAL WELLS AT THE BEAR N0. 3 MINE TO MONITOR THE EFFECTS OF MINING <br />ON THE ALLUVIAL GROUND WATER. THIS MONITORING SHALL INCLUDE MONTHLY <br />MONITORING OF GROUND WATER LEVELS, pH, TEMPERATURE AND <br />ELECTRO-CONDUCTIVITY. ON A QUARTERLY BASIS, GROUND WATER QUALITY <br />ANALYSES SHALL BE RUN ON SAMPLES COLLECTED FROM THESE ALLUVIAL WELLS. <br />Stipulation No. 3 <br />WITHIN SIXTY (60) DAYS UPON APPROVAL <br />SUBMIT DOCUMENTATION FROM THE STATE <br />THAT EITHER A PERMIT IS NOT REQUIRED <br />WATER FROM A WELL IN THE ALLUVIUM OF <br />OF THIS PERMIT REVISION, BEAR SHALL <br />ENGINEER'S OFFICE WHICH DEMONSTRATES <br />OR HAS BEEN APPLIED FOR TO WITHDRAW <br />THE NORTH FORK OF THE GUNNISON. <br />Stipulation No. 4 <br />SURVEYING OF THREE MONITORING STATIONS AT BEAR NO. 2 MINE SHALL BE <br />REPEATED ON A SEMI-ANNUAL BASIS FOR A PERIOD OF TWO YEARS. RESULTS OF <br />THE SURVEYING OF THESE STATIONS SHALL BE SUBMITTED TO THE DIVISION <br />WITHIN 30 DAYS FOLLOWING COMPLETION OF THE SEMI-ANNUAL SURVEY. IF <br />MONITORING OF THE BACKFILLED AREA DETECTS MOVEMENT, WHICH THE DIVISION <br />DETERMINES TO REPRESENT AN INDICATION OF IMMINENT HAZARD, THE BEAR COAL <br />COMPANY SHALL EXPEDITIOUSLY DEVELOP AND IMPLEMENT, FOLLOWING THE <br />DIVISION'S APPROVAL, A PLAN TO MITIGATE THAT HAZARD AND TO STABILIZE THE <br />BACKFILLED AREAS. <br />Stipulation No. 5 <br />THE DIVISION DIRECTS BEAR COAL COMPANY TO CONTINUE TO MONITOR BOTH THE <br />OPERATIONAL AND RECLAIMED CONFIGURATIONS OF THE PORTAL ACCESS ROAD AND <br />PORTAL FACILITIES OF THE NO. 3 MINE. MONITORING SHALL CONTINUE ON A <br />SEMI-ANNUAL BASIS UNTIL TWO YEARS FOLLOWING COMPLETION OF THE <br />RECLAMATION OF THE PORTAL ACCESS ROAD AND PORTAL FACILITY AREA. RESULTS <br />OF THE SEMI-ANNUAL MONITORING SHALL BE SUBMITTED TO THE DIVISION WITHIN <br />30 DAYS FOLLOWING COMPLETION OF THAT SEMI-ANNUAL MONITORING. IF THE <br />MONITORING OF THESE FACILITIES DETECTS ANY IMMINENT HAZARD, IN THE <br />OPINION OF THE DIVISION, BEAR COAL COMPANY SHALL EXPEDITIOUSLY DEVELOP <br />AND IMPLEMENT, FOLLOWING DIVISION APPROVAL, A PLAN TO MITIGATE THAT <br />HAZARD AND TO STABILIZE 7HE AFFECTED SLOPE. <br />