Laserfiche WebLink
• <br />industrial activity may choose to apply for any o three <br />different type of permits: <br />- individual <br />- group <br />- general <br />Each type of permit has its own advantages and <br />disadvantages. <br />A. Individual permit (55 Fed. Reg. 48003, 48015-21, <br />48066-67)?~ <br />-- applications are due October 1, 199 . <br />-- permit conditions may be site-speci is <br />-- principal disadvantage is cost of g thering <br />data to support the application <br />B. Group permit (55 Fed. Reg. 48003, 48021-29, 4 067-68) <br />1. Basic rules <br />-- entities representing a group of ap licante <br />that are: <br />a. part of the same effluent guideline <br />b <br />subcategory; or <br />sufficiently similar in their opera ion as <br />defined by 40 C.F.R. 122.28 may fil a group <br />application: <br />2J See also, Guidance Manual For the Preparation of NP <br />Applications for Storm Water Discharges Associated with <br />Industrial Activity (EPA 505/8-91-002). <br />Permit <br />~ - 9 - <br />