Laserfiche WebLink
<br />Colorado Divis ron of Mrnera is and Geology <br />sheec 1 of 2 <br />ESTIMATING FORM - STRUCTURAL OEMOLiT LCN aORK <br />Task No.: 1 •• Prepared by BSC <br />Permit No.: M-90-06] Filename M067-1 <br />Dace 10-Nov-98 Ope ratccn Hopemore Sha E: <br />Pe rm itc ing action Reevaluate amount of required bond <br />Task description St nctural Demolition <br />MEANS Location Adj us[me nt: 100.0Jk <br />__________________ cf base unit costs - MEANS SITE WORK s LANDSCAPE COST CATA 1997 <br />_______ Edition <br />__ <br /> ~ ~ ~ MEANS BASES ADJUSTED <br />STRUCTURE / FACILITY / EQUIPMENT DESCRIPTION ~ DIMENSIONS ~ COMPOSITION ~ QUANTITY ~ UN IT ~ UNIT COST ~ TOTAL COST <br />Hopemore Shaft Area ~ ~ ~ ~ <br />Shaft Building- Superstructure ~ 18'•24'•12' ~ Steel ~ 5,109 ~ cu. ft. ~ 50. 20 ~ 51,037 <br />Floor ~ 18'•29' ~ Concrete ~ 432 ~ sq. ft. ~ $3. 34 ~ 51,44] <br />Footings ~ Buzied ~ Concrete ~N/A <br />Hoist Room fi Shop- Supe rstruc[ure ~ 24'•36'•12' ~ Steel ~ 10, J6B ~ cu. ft. ~ 50. 20 ~ $2,0]9 <br />Floor ~ 29'•36' ~ Concrete ~ 869 ~ sq. ft. ~ 53. 34 ~ $2,BBfi <br />Footings ~ Buried <br />~ ~ Concrete <br />~ ~ ~ <br />~ ~ ~ <br />~ ~ <br />Compressor Room- Superstructure ~ 32'•10'•12' ~ Steel ~ 7,840 ~ cu. f[. ~ $0. 20 ~ 5768 <br />Floor ~ 32'•10' ~ Concrete ~ 320 ~ sq. f[. ~ 53. ]9 ~ 51,069 <br />Footings ~ Buried ~ Concrete ~ ~ ~ ~ <br /> <br />Water Tank Building ~ <br />~ 10'•10'•10' ~ <br />~ Steel ~ ~ <br />~ 1,000 ~ <br />cu. ~ <br />ft. ~ <br />50. ~ <br />20 ~ <br />$200 <br />Hunter Shaft Area <br />Hoist Room- Superstructure ~ 12'•18'•12' ~ Steel ~ 2,592 ~ cu. ft. ~ $0. 20 ~ 5618 <br />Floor ~ 12'•18' ~ Concrete ~ 216 ~ sq. fc. ~ 53. 34 ~ 5721 <br />Footings ~ Buried <br />~ ~ Concrete <br />~ ~ ~ <br />~ ~ <br />~ <br />~ <br />Shaft House- Superstructure ~ 24'•22'•15' ~ Steel ~ 7,920 ~ cu. ft. ~ 50. 20 ~ $1,584 <br />Floor ~ 24'•22' ~ Concrete ~ 62B ~ sq. ft. ~ 53. 79 ~ 51,764 <br />Footings ~ Buried ~ Concrete <br />Generator Shed- Superstructure ~ 9'•12'•12' ~ Steel ~ 1,296 ~ cu. ft. ~ 50 .20 ~ 5259 <br />Mi11 Site Area <br />Mill Building- Superstructure ~ 100'•40'•20' ~ Steel ~ 80,000 ~ cu. ft. ~ 50 .20 ~ 516,000 <br />Floor ~ 100'•40' ~ Concrete ~ 4,000 ~ sq. £t. ~ 53 .39 ~ $1],360 <br />Footings ~ Buried <br />~ <br />~ <br />~ <br />~ <br />~ ~ Concrete <br />~ <br />~ <br />~ <br />~ <br />~ ~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ ~ <br />~ <br />~ <br />~ <br />~ <br />~ ~ <br />~ <br />~ <br />~ <br />~ <br />~ <br /> ~ <br />~ <br />~ ~ <br />~ <br />~ ~ ~ <br />~ ~ <br />~ ~ <br />TASK ~ <br />~ <br />~ <br />SUBTOTAL - shee ~ <br />~ <br />~ <br />c 1 <br /> <br /> <br />41,682 <br />