My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30412
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:47:58 PM
Creation date
11/22/2007 10:13:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
General Documents
Doc Date
11/21/1995
Doc Name
MEMO-REMOVAL OF TAILING FROM THE HAZEL-A ADIT-COLINO ORO MOLINO INC GOLD HILL MILL PN M-94
From
DMG
To
CARL MOUNT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Ill 1111111111111111 E OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGI <br />Depanmem of Natural Resources <br />131 3 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone. (3031 866 3 56 7 <br />FA%:13031 812-8106 <br />Post-it" Fez Note 7671 Date ~ ~zr~ pa°ges~ / <br />70 c _~~ ~ From ~/// <br />/ ~ ! ~ ~~ <br />Co./Dept. Co. <br />Phone N Phone N <br />Fax p 7 z r. ~ Fax M <br />~I~I~~ <br />DEPARTMENT OF <br />NATURAL <br />DATE: November 21, lyy5 RES~~CES <br />Foy Romer <br />TO: Carl Mount Governor <br />~~ lames S Lochhead <br />E.ennive Dnranr <br />FROM: Allen Sorenson n,ic na rl e. Eonp <br />Dim sion Director <br />RE: Removal of Tailing from the Hazel-A Adit, Colina Oro Molino,) <br />Inc. (COM, Inc.), Gold Hill Mill, Permit No. M-94-117 <br />The operator is required (letter: Sorenson to Fraser, 10/6/95) to remove <br />tailing slimes from the Hazel-A adit. The adit is to be cleaned "down to <br />intact rock". The 10/6/95 letter specified that the "procedure for the <br />slimes removal operation must be described in detail in a written <br />submittal to the Division, which must be reviewed and approved by the <br />Division prior to initiation of the project". Items which must be <br />included in the operator's proposal are: <br />1. Description of tailing and process water removal method that will <br />assure containment until tailing and water can be redeposited in the <br />pond. <br />2. A statement from the operator that any spillage during the tailing <br />clean-out operation will be immediately contained and removed to the <br />tailing impoundment. <br />3. Detailed procedure for reconstruction of the Hazel-A bulkhead, <br />including provisions for relining the inby face of the bulkhead with <br />hypalon, PVC, or other durable plastic, and for sealing the bulkhead <br />at the interface with the rib. <br />~ 4. A statement from the operator that the Hazel-A adit will be <br />accurately surveyed to determine water storage capacity behind the <br />bulkhead. <br />5. The Division needs to be satisfied that the slimes removal <br />procedures proposed will be adequate to eliminate virtually 100 <br />percent of the tailing material deposited in the adit. <br />COM, Inc. has been notified that the Division will need to receive the <br />written proposal by Wednesday, 11/22/95 if they want to initiate the <br />project by 11/27/95. If the project is underway by 11/27/95. I intend to <br />be on-site to observe the operations. <br />CC: R1C Fanyo C:~WPSI~GOLDHILL.SL2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.