Laserfiche WebLink
~-' <br />~.ambert attb S~,~cgouate~c <br />CONSULTiNO GEOTECHNICAL ENCi1NEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: Mga2ogMT <br />PROJECT NAME: west Elk cline Gob Pile <br />PROJECT LOCATION:Somerset, Colorado <br />CLIENT: Chesnik Construction <br />CONTRACTOR: Chesnik Construction <br />~II II~II~II~'I~~ ~I~ <br />sss <br />RECEIVED <br />OCT 2 9 1998 <br />Division of Minerals 8 Geobgy <br />DATE: Friday, 9-18-98 <br />TELHN I C I AN : casias <br />WEATHER CONDITIONS: Sunny <br />WORK REQUESTED: Density <br />tests <br />FOREMAN: Mr. Chuck Chesnik <br />WORK PER ORNED BY AN ERT AND A550 I TES REPRESENTATIVE AND REMARKS <br />I arrived at the project site at 10:30 A.M. as requested by Mr. Chuck Chesnik. <br />I performed soil density tests as requested by Mr. Chesnik of material being placed <br />for gob pile subgrade using nuclear soil density test methods. Please refer to the <br />test results sheets for approximate test locations and test results. The test <br />results were verbally given to Pir. Chesnik of Chesnik Construction at the time of <br />our site visit. The test results indicate only the relative compaction and soil <br />moisture content of the material tested at the elevation and location tested at <br />the time of our site visit. ' <br />P S~S ~Y~ - ~ CL~ <br />~~ ~ J ~ <br />S 2`ti~ I ~ , <br />~~°~- ,~ <br />GRAND JUNCTION. CO 11601 YONTROQt CO 0107 <br />(670) 716M06 (Y7~ 7~}r'H <br />Z,..DDO D16 <br />DURANOO. CO /1701 <br />f9T01 If-SOH <br />