My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30361
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:47:55 PM
Creation date
11/22/2007 10:12:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
General Documents
Doc Date
1/26/2006
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I -INTRODUCTION <br />Puraose of this Document <br />This document presents the results of the Midterm Permit Review of Oakridge Energy, Inc.'s <br />Cazbon Junction Mine. The Colorado Division of Minerals and Geology ("DMG"} conducted <br />this review for the purpose of fulfilling the requirements of the Colorado Surface Coal Mining <br />Reclamation Act (the "Act"), and the Regulations of the Colorado Mined Land Reclamation <br />Board for Coal Mining (the "Regulations"). <br />Oreanization of this Document <br />This document is divided into the following three parts: <br />Part I -Introduction <br />Part II - Swnmary of Operations, Revisions to Permit, <br />Violations, Stipulations, Variances, and Bond <br />Part III -Requested Revisions of Permit Application <br />Midterm Review Requirements of the Regulations <br />Section 2.08.3 of the Regulations requires the Division to conduct a general review of each <br />mining and reclamation permit prior to the middle of the permit's term (2 '/Z yeazs). Based on <br />this Midterm Review, for good cause shown, the Division may require the petznittee to revise or <br />modify the permit in order to ensure compliance with the Act and the Regulations. <br />Table 1, below, lists the other Sections of the Regulations that require a Midterm Review of <br />specific aspects of each permit. <br />Table 1 -Specific midterm review topics <br />Section <br />Topic <br />2.06.2(10) Experimental practices <br />Applicability at the <br />Carbon Junction <br />Mine <br />Inapplicable, no <br />such practices. <br />2.06.3(4)(a) Mountaintop removal Inapplicable, no <br />variances such vaziances. <br />Carbon Junction Mine Page 2 January 26, 2006 <br />Midterm Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.