Laserfiche WebLink
<br />• <br />i III IIIIIIIIIIIII III <br />DEPARTMENTOFNATURALRESOURCES <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SNELTON, Director <br />R icnar0 D. Lamm <br />Governor <br />September 14, 1983 <br />Mr. Larry Reschke <br />Blue Ribbon Coal Company <br />P.O. Box 58 <br />Delta, Colorado 81416 <br />RE: Stipulation No. 3 to Blue Ribbon's Permit C-D47-81 <br />Dear Mr. Reschke: <br />The Division has reviewed your response to our Jul1e 22, 1983 review <br />letter of the above referenced stipulation response. Attached is a memo <br />from Jim Pendleton of our staff who conducted the review. <br />The only remaining concern is that Blue Ribbon ha s. not committed to <br />reinstalliny the destroyed survey monuments at the mine. The Division <br />proposes an October 31, 1983 compliance deadline to complete this task. <br />This deadline will be included within our next inspection report. <br />When the monuments have been properly installed the Division will <br />consider this stipulation resolved. <br />Please call me if you have any problems with our compliance date. <br />Sincerely, <br />j"j Lam. ~ '~~.i~'1"~ 'c~~G U <br />v' G <br />Robert G. Liddle <br />Reclamation Specialist <br />RGL/eap <br />cc: Jim Pendleton <br />Uoc. No. 5518 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />