Laserfiche WebLink
<br />C. Rule 3.03.1(2) (c) Release of Remaining Bond ......................................................... 21 <br />• D. Rule 3.03.2(2) Remaining Reclamation; Water Pollution ...................................... 21 <br />1. Degree of Difficulty ......................................................................................... 21 <br />2. Pollution of Surface Water ............................................................................. 22 <br />3. Pollution of Ground Water ............................................................................22 <br />4. Cost of Pollution Abatement .........................................................................22 <br />5. Probability of Future Pollution ..................................................................... 22 <br />E. Retention of Bond ....................................................................................................... 22 <br />1. Rule 3.03.1(3)(a) Reestablishment of Revegetation ....................................22 <br />2. Rule 3.03.1(3)(b) Suspended Solids, Productivity and Hydrologic <br />Functions 22 <br />3. Rule 3.03.1(3)(c) Maintenance of Permanent Impoundments ..................23 <br />4. Rule 3.03.1(3)(d) Minimum Retention -Remaining Reclamation Work .. 23 <br />5. Rule 3.03.1(3)(e) Alternative Postmining Land Use Bond Coverage........23 <br />6. Rule 3.03.1(4) Minimum Retention - $10,000 Minimum ........................... 23 <br />7. Rule 3.03.1(5) Temporary Drainage and Sediment Structures ................. 24 <br />S. Rules 4.05.13(1)(d)(ii), 4.05.13(3)(a), and 4.07 Removal of Monitoring <br />Equipment ....................................................................................................... 24 <br />9. Rule 4.15.8 Success Standards for Cover ..................................................... 24 <br />10. Rule 4.15.9 Revegetation Criteria, Cropland ...............................................24 <br />11. Rule 4.20.3(1) Surface Owner Protection (Subsidence) ............................. 24 <br />12. Resolution of Comments and Other Reclamation Requirements ............. 25 <br />F. Summary and Conclusions ........................................................................................ 25 <br />• G. Written Results of Inspections and Evaluations .....................................................25 <br />VI. PROPOSED DECISION ....................................................................................................... 25 <br />A. Rule 3.03.2(5)(a) Decision and Written Notification ..............................................25 <br />B. Rule 3.03.2(5)(b) Decision Becomes Final ............................................................... 26 <br />VII. ADJUDICATORY HEARING ON PROPOSED DECISION TO RELEASE [Rule <br />3.03.2(6)] .................................................................................................................................26 <br />VIII. TERMINATION AND REASSERTION OF JURISDICTION .......................................... 27 <br />A. Rule 3.03.3(1) Termination of Jurisdiction ..............................................................27 <br />B. Rule 3.03.3(2) Reassertion of Jurisdiction ............................................................... 27 <br />• 3 Apri127, 1998 <br />