My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30114
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:47:45 PM
Creation date
11/22/2007 10:08:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
12/11/1997
Doc Name
GEOTECHNICAL REPORT SYLVESTER GULCH SITE DEVEOLPMENT 12/2/97 - 12/8/97
From
MOUNTAIN COAL CO
To
MLR
Permit Index Doc Type
EXPLORATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />III IIIIIIIIIIIIIIII <br />Mountain Coal Company <br />West Elk Mine <br />Post Office Box 591 <br />Somerset, Colorado 81434 <br />Telephone 970 929-5015 <br />Fax 970 929-5595 <br />December 09, 1997 <br />Michael P. Boulay <br />Dr. James Pendleton <br />Colorado Division of Minerals & Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RECEIVED <br />DEC 11 1997 <br />pivision of INinarals & Geology <br />Re: Geotechnical Report -Sylvester Gulch Site Development <br />Ref: Permit Revision 07 and Technical Revision 79 to Permit No. C-80-007, <br />West Elk Mine <br />Dear Mr. Boulay and Dr. Pendleton: <br />The following presents Mountain Coal Company's (MCC) current summary of geotechnical issues for the <br />Sylvester Gulch Site Development Project, a general construction summary, and our current schedule of <br />critical activities. The following information covers the time period from December 02, 1997 - <br />December O8, 1997. <br />General Construction Summary and Schedule <br />Construction efforts aze essentially complete with the exception of the upper detention pond and detention <br />pond outlet channel, lining sediment pond SG-l, and completion of punch list items. Snow and cold <br />temperatures during the week slowed the completion of these remaining items, with ground conditions <br />remaining snow covered and frozen throughout the week. <br />Current Schedule <br />The expected completion date for remaining tasks are as follows: <br />Upper Detention Pond Tn Progress Complete 12/l~ <br />Pond SG-l In Progress Complete 12/15 <br />Guazdrail Installation Completed <br />Punch List Items In Progress Complete 12/19 <br />Final completion and Demobilization 12/19 <br />Field Observations, Data Collection, and Ongoing Evaluations <br />A partial inspection was performed by MCC on 12/08/97 to visually observe and evaluate the stability of <br />slopes within the project area. Data collection efforts continue and evaluation or re-evaluation of specific <br />
The URL can be used to link to this page
Your browser does not support the video tag.