Laserfiche WebLink
<br />iii iiiiiiiiiiiii iii <br />999 <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources .. of,~,c~o\~oq <br />N <br />~ ~ l+7~7C+•~ <br />1313 Sherman S1.. Room 215 ~g <br />Denver, CO 80203 • n ~ ~• <br />303 666-3567 '' B 6 " <br />Fax 303 832-6106 <br />Roy Romer. <br />Gw~em~ore <br />h1INING PERMIT - COAL ~~~~i~~r~ <br />JAM 2 G 139D <br />Permit Date December 10, 1989 Permit No. C-84-065 MINED LAh;D <br />Permit Expiration Date October 09, 1991 RE: LAivIATIOh D!i/ISIOiU <br />THIS PERMIT is issued by the Mined Land Reclamation Division, Department of <br />Natural Resources, State of Colorado. <br />RECITALS <br />I. New Castle Energy Co ("operator") desires to conduct a mining operation <br />known as Coal Ridge No 1 for the purpose of reclamation, ! <br />II. On December 10, 1989, <br />Division") approved the ope <br />amount of bond and directed <br />the Division of bond in the <br />the Division, and such bond <br />the Mined Land Reclamation Division <br />rator's application for this permit, <br />that this permit be issued upon the <br />amount so fixed in form and substan~ <br />has been so furnished, <br />("the ~~ <br />fixed the <br />filing with <br />:e approved by <br />III. On December 15, 1989, the Division made the following findings: <br />(al The permit application is accurate and contains all information <br />required under C.R.S., 34-33-101 et seq. and regulations oromulaated <br />thereunder and that all the requirements of Article 33 of Title 34, C.R.S. <br />("such article") for the issue of a permit have been complied with; <br />(b) The applicant has demonstrated that reclamation as required by such <br />article can be accomplished under the reclamation plan contained in the permit <br />application; <br />(c) The assessment of the probable cumulative impact of all anticipated <br />mining in the area on the hydrologic balance specified in Section <br />34-33-110(2)(1) has been made by the Division and the proposed operation <br />thereof has been designed to prevent material damage to the hydrologic balance <br />outside the permit area; <br />(d) Granting the permit will not conflict with any designation decision <br />issued pursuant to Section 522 of the Federal "Surface Mining Control and <br />Reclamation Act of 1977", as amended, (P.L. 95-87), nor is the area proposed <br />to be mined within an area under study for unsuitability designation in an <br />administrative proceeding commenced pursuant to Section 34-33-126 or <br />Section 522 of said P.L. 95-87. <br />