iii iuiuiiiiiu iii
<br />
<br />Colorado Division of Minerals and Geology
<br />ESTIMATING FORK - STRUCTURAL DEMOLITION WRK
<br />____________________________________________
<br />____________________________________________
<br />Task Mo.: 10 Prepared by SLB
<br />Permit No.: C-80-001 Filename 0001-f0
<br />Date 08-Nov-94 Operation Edna Mine
<br />Permitting action 1994 Midterm/TR 30
<br />sheet 1 of 4
<br />Task description Remove ell structures
<br />MEANS Location Adjustment: 97.70X of base unit costs - MEANS SITE NORK 8 LANDSCAPE COST DATA 1994 Edition
<br />MEANS BASE ADJUSTED
<br />STRUCTURE / FACILITY / EQUIPMENT DESCRIPTION ~ DIMENSIONS ~ COMPOSITION ~ DUANTITY ~ UNIT ~ UNIT COST ~ TOTAL COST
<br />
<br />I
<br />vcvaaaevicevevaa acevvvvvcc:ccaacaacaavccvvaaaaa
<br />________ ______
<br />_________ ___
<br />________laaaaaaaccca
<br />_________
<br />aal________ ___
<br />________aa aaaavvvv ___evvaccac vvevvvvevaav
<br />Office building ~ N/A ~ STEEL ~ 120,000 ~ CF ~ 50.17 ~ f19,931
<br />Loner boneyard ~ N/A ~ MISC ~ 3,000 ~ CF ~ 50.17 ~ f498
<br />pulp house behind office ~ N/A ~ STEEL ~ 200 ~ CF ~ 50.17 ~ f33
<br />fuel storage shack _ ~ N/A ~ STEEL ~ 1,000 ~ CF ~ 50.17 ~ f166
<br />l nip coal sales sheds ~ N/A ~ STEEL ~ 480 ~ CF ~ 50.17 ~ f80
<br />Tipple scale house ~ N/A ~ STEEL ~ 1,875 ~ CF ~ 50.17 ~ f311
<br />Bath house ~ N/A ~ STEEL ~ 1,000 ~ CF ~ 50.17 ~ f166
<br />Foreman's office ~ N/A ~ STEEL ~ 2,000 ~ CF ~ f0.17 ~ f332
<br />Silo, demolition only ~ N/A ~ CONCRETE ~ 6,000 ~ CY ~ f14.71 ~ 586,210
<br />Rapid load building ~ N/A ~ STEEL ~ 150,000 ~ CF ~ f0.17 ~ 524,914
<br />Loadout building ~ N/A ~ STEEL ~ 125,000 ~ CF ~ 50.17 ~ f20, 761
<br />conveyor transfer dJi lding C ~ N/A ~ STEEL ~ 1,500 ~ CF ~ 50.17 ~ f249
<br />conveyor transfer building 8 ~ N/A ~ STEEL ~ 1,500 ~ CF ~ f0.17 ~ f249
<br />cmveyor transfer building A ~ N/A ~ STEEL ~ 1,500 ~ CF ~ 50.17 ~ f249
<br />conveyor section from silo to smell tipple ~ N/A ~ STEEL ~ 375 ~ LF ~ 5170.61 ~ (40,525
<br />corneyor section from silo to main tipple ~ N/A ~ STEEL ~ 600 ~ LF ~ S1f0.b1 ~ 564,840
<br />conveyor section from tipple to C ~ N/A ~ STEEL ~ 425 ~ LF ~ S1f0.61 ~ (45,928
<br />conveyor section from C to B ~ N/A ~ STEEL ~ 1,200 ~ LF ~ 523.38 ~ 527,411
<br />conveyor section from B to A ~ N/A ~ STEEL ~ 650 ~ LF ~ 523.38 ~ 514,847
<br />conveyor section from A to loading hopper ~ N/A ~ STEEL ~ 30 ~ LF ~ 5110.61 ~ 53,242
<br />coal loading hopper ~ N/A ~ STEEL ~ 9,000 ~ CF ~ (0.17 ~ 51,495
<br />shack by loading chute ~ N/A ~ STEEL ~ 4,500 ~ CF ~ (0.17 ~ 5747
<br />otf ice/maintenance shop ~ N/A ~ STEEL 1,296,000 ~ CF ~ 50.17 ~ (215,253
<br />fuel tank behind office/maint. shop ~ N/A ~ STEEL ~ 6,755 ~ LF ~ 50.17 ~ 51,122
<br />fuel/lobe building ~ N/A ~ STEEL ~ 7,500 ~ CF ~ (0.17 ~ f1,246
<br />barrel bay structure ~ N/A ~ STEEL ~ 450 ~ CF ~ f0.17 ~ f75
<br />barrels ~ N/A ~ ~ STEEL ~ 20 ~ EACN ~ 5232.50 ~ f4,543
<br />warehouse / truck barn ~ N/A ~ STEEL ~ 324,000 ~ CF ~ (0.17 ~ (33,813
<br />electrical shop ~ N/A ~ STEEL ~ 30,000 ~ CF ~ 50.17 ~ f4,983
<br />bath house ~ N/A ~ STEEL ~ 120,000 ~ CF ~ (0.17 ~ 519,931
<br />boneyertl material south of warehouse ~ N/A ~ MISC ~ 22,500 ~ CF ~ f0.17 ~ f3, 737
<br />boneyard north of stockpile ~ N/A ~ MISC ~ 13,500 ~ CF ~ f0.17 ~ f2,242
<br />seed storage building ~ N/A ~ STEEL ~ 19,036 ~ CF ~ 50.17 ~ 53,162
<br />safety trailer ~ N/A ~ STEEL ~ 7,500 ~ CF ~ (0.17 ~ 51,246
<br />tire storage building ~ N/A ~ STEEL ~ 30,000 ~ CF ~ 50.17 ~ f4,983
<br />bucket house ~ N/A ~ STEEL ~ 9,000 ~ CF ~ 50.17 ~ 51,495
<br />ummned building edj scent to shop ~ N/A ~ STEEL ~ 30,000 ~ CF ~ 50.17 ~ f4,983
<br />grizzly ~ N/A ~ STEEL ~ 150 ~ CF ~ f0.17 ~ S25
<br />r asa vvvvccca vevvveecaa.. e:::::::::a:cavvvac.ccaacaaaaaaaaa acaaaa:::c:a:av ecaa aa caasaaosaaxccr_ccaaa_ eacaccccvesavvaaxas
<br /> TASK SUBTOTAL - sheet 1 f676,022
<br />aesv_caavs
<br />
|