Laserfiche WebLink
i <br /> <br /> <br />-2- <br />8. Reclamation <br />- Routing of stream flow across reclaimed tailings; <br />- Adequacy of financial warranty; <br />- Increased post-reclamation erosion and sedimentation; <br />- Increased flow in adjacent streams; <br />- Revegetation seed mixture; <br />9. Other <br />- Those items listed in the Division's December 18, 1989 adequacy review. <br />SGR/yjb <br />2938E <br />