My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-09-13_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1993-09-13_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 9:38:53 AM
Creation date
11/22/2007 1:39:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
9/13/1993
Doc Name
SAN LUIS PROJECT REVISION APPROVAL PN M-88-112 RN TR8
From
DMG
To
BATTLE MOUNTAIN RESOURCES INC
Type & Sequence
TR8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~_ <br />:~ <br />-2- <br />Stipulation No. 03 <br />BATTLE MOUNTAIN RESOURCES WILL, WITHIN 60 DAYS OF THE APPROWIL OF <br />TR-O8, INSTALL AN ADDITIONAL GROUND WATER MONITORING WELL BETWEEN THE <br />COLLECTION POND AND THE TOE OF TAILINGS DAM. THIS WELL WILL BE <br />DRILLED, LOGGED, AND COMPLETED IN A MANNER COMPARABLE TO THAT EMPLOYED <br />FOR WELLS M-9 AND M-12. EVIDENCE DEMONSTRATING THE INSTALLATION WILL <br />BE PROVIDED TO THE DIVISION WITHIN 30 DAYS OF THE COMPLETIONiOF THE <br />WELL. THIS WELL WILL BE MAINTAINED AND EMPLOYED FOR GROUND WATER <br />MONITORING OF THE SANTA FE AQUIFER AS APPROVED FOR WELLS M-9, M-12, AND <br />M-13. <br />Stipulation No. 04 <br />BATTLE MOUNTAIN RESOURCES WILL SUBMIT, WITHIN 60 DAYS FOLLOWING <br />APPROVAL OF TR-08, A TECHNICAL REVISION TO THE PERMIT WHICH, WHEN <br />APPROVED, WILL OUTLINE THE MANNER IN WHICH BATTLE MOUNTAIN RESOURCES <br />WILL DEMONSTRATE TO THE DIVISION'S SATISFACTION THE QUALITY ~F GROUND <br />WATER BENEATH THE TAILINGS FACILITY AND COLLECTION POND PRIG TO ANY <br />REQUEST BY BATTLE MOUNTAIN RESOURCES FOR FULL RELEASE OF RECILAMATION <br />RESPONSIBILITY AND BOND. <br />Stipulation No. 05 <br />BATTLE MOUNTAIN RESOURCES WILL, WITHIN 60 DAYS OF THE APPROVAL OF <br />TR-08, INSTALL A REPLACEMENT WELL FOR M-13 AT A LOCATION ACCf~PTABLE TO <br />THE DIVISION. THE REPLACEMENT WELL WILL BE DRILLED, LOGGED, .AND <br />COMPLETED IN A MANNER ACCEPTABLE TO THE DIVISION AND COMPARABLE TO THAT <br />EMPLOYED FOR WELLS M-9 AND M-12. EVIDENCE DEMONSTRATING THI <br />INSTALLATION WILL BE PROVIDED TO THE DIVISION WITHIN 30 DAYS OF THE <br />COMPLETION OF THE WELL. THIS WELL WILL BE MAINTAINED AND EMPLOYED FOR <br />GROUND WATER MONITORING OF THE SANTA FE AQUIFER AS IS APPROVED IN THE <br />PERMIT FOR WELLS M-9, M-12 & M-13 <br />Stipulation No. 06 <br />TWENTY PERCENT OF THE TOTAL AMOUNT OF FINANCIAL WARRANTY REQI~IRED FOR <br />RECLAMAITON OF THE WORST-CASE DISTURBANCE AT THE SAN LUIS MI E (PERMIT <br />M-88-112) SHALL BE RETAINED BY THE BOARD AND NOT SUBJECT TO RELEASE <br />UNTIL GROUND WATER MONITORING HAS BEEN COMPLETED ACCORDING TO THE <br />APPROVED PLAN AND FOR THE APPROVED LENGTH OF TIME, THE DEMONSTRATIONS <br />OF WATER QUALITY BELOW THE TAILINGS FACILITY AND COLLECTION HWVE BEEN <br />POND MADE ACCORDING TO APPROVED PLAN AND ANY GROUND WATER QUALITY <br />REMEDIATION EFORTS REQUIRED BY DIVISION HAVE BEEN COMPLETED Tp THE <br />DIVISION'S SATISFACTION. THE AMOUNT OF BOND RETAINED SHALL NpT BE <br />REDUCED UNLESS EVIDENCE, ACCEPTABLE TO THE DIVISION, HAS BEEN PROVIDED <br />THAT A LESSER AMOUNT IS ADEQUATE TO GUARANTEE COMPLETION OF THE <br />ACTIVITIES LISTED ABOVE. <br />If you have any questions, please contact me. <br />Sincerely, <br />~lC.la,,-,~-, CS~{-P,ve„ta. <br />~' <br />Larry D. Oehler <br />Reclamation Specialist <br />5432G <br />
The URL can be used to link to this page
Your browser does not support the video tag.