Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : DMG <br />002 State : Colorado <br />02/19/2003 County: Park <br />JD7 Site : Chaparral Meadows Prt <br />Permit or other jab action :Final Reclamation <br />Task description : feplaCe tOpS011 <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />PermiUjob # : M-1984-101 <br />Abbreviation :none <br />Filename : M101-002 <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 637G <br />-Push dozer : NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhipcost/hour: $75.69 NA NA NA NA NA <br />OperatingcosUhour: $149.02 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $25.43 NA NA NA NA NA <br />Unit subtotals : $250.14 NA NA NA NA NA <br />Number of units : 7 0 0 0 0 0 <br />Group subtotals : Work : $250.14 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $250.14 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 53,350 LCY factor: NA <br />Loose <br />volume : 53,350 LCY <br />Source of quantity take-off :calculation <br />Source of estimated swell factor : NA <br />