My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-19_REVISION - M1984101
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984101
>
2003-02-19_REVISION - M1984101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:24 PM
Creation date
11/22/2007 1:39:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984101
IBM Index Class Name
Revision
Doc Date
2/19/2003
Doc Name
Cost Summary Form
From
DMG
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;r~-oa <br />ROJEGT IDENTIFICATION / <br />Date : 19-Feb-2003 <br />User: JD7 <br />Permit or job no. <br />Abbreviation <br />Filename <br />Agency or organization name : DMG <br />Permit or job action :final reclamation <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Grade highwalls to 3:1 dozer 1 40.0 $5,294 <br />002 -Replace topsoil scraped 1 132.0 $33,026 <br />003 -Rip compacted areas ripper 1 11.0 $1,720 <br />004 -Rubbilize and bury concrete foundation dozer 1 4.0 $400 <br />005 -Reseed disturbed areas revege 1 80.0 $47,236 <br />007 -Mob/demob equipment mobilize 3 8.0 $3,401 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 275.0 $91,077 <br />' includes lntlation factor adjustment of : NA °!° <br />INDIRECT COSTS <br /> <br />Site : Chaparral Meadows Pit <br />State :Colorado <br />County :Park <br />TOTAL DIRECT COST' =I $91,077 <br />ovERREAD AND PROFIT- Liability insurance : 1.55 % of direct total = $1,412 <br />Performance bond : i.05 % of direct total = $956 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $9,108 <br />'not required (or eqp. operdror serves as super.) TOTAL 0 8 P = $11, 476 <br />LEGAL-ENGMEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08 Pj= $102,553 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contracUbid preparation : 4.25 % of cntr. NA total = $4,358 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $5,128 <br />CONTINGENCY - NA' NA total = NA <br />'contingencies accounted for at tasklevel TOTAL INDIRECT COST= $20,962 <br />TOTAL BOND AMOUNT (direct + iindirect) _ $i 12,039 <br />RoL.c.e.S-1 -rts <br />~ Gto2`t~ro <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM •~ <br />M-1984-101 / <br />none <br />M101-000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.