Laserfiche WebLink
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br /> TRUCK/LOADER TEAM WORK <br />.. s,: <br />PROJECT IDENTIFICATION ...;;: ..;::: :.: .~. ~~: ;;: <br />Agency or organization name :Division Of Minerals 8 Geology <br />Task # : 001 State :Colorado PermiUjob # : M-1985-184 <br />Date: 12/01/2003 County:Larimer Abbreviation ;none <br />User: ESC Site :Killion Supply Filename:M184-001 <br />Permit or other job action :TR-Of <br />Task description :Load 8 Place Concrete/Asphalt Along Pit Shorelines <br />HOURLY EQUIPMENT COSTShift basis : ~ 1 per day <br />Truck/loader team -Truck :Generic 8-f0 cy, 6x4 <br />-Loader :CAT 928G <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water Wck <br />3116 <br />Cost Breakdown : Tmck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Tmck <br />Import data filename : tmck2 loader NA excavate NA NA <br />Utilization-machine : 78 100 NA 100 NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cosUhour: $12.62 $11.89 NA $14.56 NA NA <br />Operating cost/hour: $14.98 $18.36 NA $16.24 NA NA <br />Ripper op. cosUhour : NA NA NA NA NA NA <br />Ope2tor cosVhour : $24.14 $31.83 NA $32.02 NA NA <br />Unit subtotals : $51.74 $62.08 NA $62.82 NA NA <br />Number of units : 2 1 0 1 0 0 <br />Group subtotals : Work : $165.56 Support : $62.82 Maintenance : $0.00 <br />Total work team cosUhour : 5228.38 <br />Initial Swell Loose <br />volume : 15,000 LCY factor : NA volume : 15,000 LCY <br />Source of quantity take-oH:Opi <br />Source of estimated swell factor :NA <br />Material purchase cost :i <br />HOURLY PRODUCTION <br />Truck Caoaci <br />$0.00 /LCY Total cost; ,f0 <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,950 pounds/LCY SWCk volume : 8.00 LCY <br />Descr.: Traprock -broken Heaped volume : 10.00 LCV <br />Rated payload : 27,280 pounds Average volume : 9.00 LCY <br />Payload capacity : 9.24 LCY Adjusted volume': 9.24 LCY <br /> Final truck volume based on number of loader passes : 8.44 LCY <br /> • tnxk vdurre adjusted to trot ezce M rated payload or heaped wlurre <br />Loading Tool Capacity : Job Condition Comeclions : Site altitude (ft.) : 5,500 <br />Rated capacity (nom, heaped) : 2.500 LCY Tmck loader Source <br />Descr.: Blasted rock -goody blasted (60 - 75%) Altitude atlj.: 1.000 1.000 (Cat HB <br />Bucket fill factor : 0.675 Job efficiency : 0.830 0.830 (1 shiR/da <br />Adjusted bucket capacity : 1.688 LCY Net correction : 0.830 0.830 <br />Estimate <br />