Laserfiche WebLink
Readable equipment: • ~ sheet 2 of 2 <br />" """" " " " "' Total Ecp• Flee: Sise Haul Trip Return Trip <br />N.achine Description Cost/hr (no. haule3( Cost/hr Cast/hr <br />------------------------------------------------------------------------------------------------- <br />Subtotals <br />MOB/D3HOB SUPPORT EBUIPHBNT <br />" " "" "" " " " " " " "' Weight Ownership Hacl Rig Fleet Siee Haci Trip Return Tr.c DCT 2ermit <br />Nor.-Rosdahle Hqp. Description (tonsl Ccst/hr Cost/hr !no. hauled( Cos:/hr Ccst!hr Costley <br />------------------------------------------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------------------------------------------- <br />HutWtals <br />......... ......... ......... <br />Tttal 6qp. Fleet Siee Hau] Trip Return 'rip <br />Readable Hqp. Description Ccst/hr (no. hauled) C~et/hr Cost/hr <br />i <br />' Subtotals <br />HO~IPHHNT HAUL DISTANCR 4 TIHH <br />------------------------------ <br />--r------°-------------°--' <br />Neatest major city or tour. within project area region: Lamar <br />........................................................ <br />Totai the way [ravel dis:acce = 2?.0 miles. Average :ravel speed = 45.00 mph. <br />...... ............. <br />dcb 'ime - Nom Eoadable 3quip.= 0.50 hours load Readable Hqu:p.= N/A hears ]cad <br />].43 hours haul 0.49 hours haul <br />0.50 Yours cnload NIA i.ours unload <br />0.49 hours return 0.49 hours return <br />JOB COST <br />Total Mcb/Denob Post = 451(.14 <br />r <br />NOTE: Non-roadable equipment (haul rig required to transport( mob/demcb costs based oa 2 round :rips, each trip <br />~ cansist:ng of s one-way loaded haul end x one-wsy empty return. P.oada6le equipment (no 'saw] r.g remuired~ <br />costs based on one round .rip. Co foredo [OT requires special permits for oversiee equipment or. tertair. <br />specified road segments within the State. Separate permits are required for each rig on esct loaded trip. <br />Additioneily, pilot cars (one or tro per rig depending on degree of oversise) are also required for oversise <br />1' equipment 6acling, and ioeding/unloading times must he icereased substantially fnr equipaen: which atst 6e <br />7 partiallq dismantled for transport and re-assenhled a: the job sit2• Casts for li'ting equipment and other <br />scppcrt equipment needed for this work should be included in the nob/denote costs. <br />1 <br />