Laserfiche WebLink
• S E C T I O N 4 0 <br />I"lDEX <br /> Tit 1e Paz <br /> 4.1 Statement of Purpose and Pre-Mining Land Use 4-1 <br /> 4.1.2 Hear Coal Company Reclamation 4-1 <br /> 4.2 Reclamation Timetable 4-2 <br /> 4.2.1 Post-t9ining Drainage and Sediment Control Plan 4-2 <br /> 4.3 Post-.`4ining Land Use and Topography 4-3 <br /> 4.4 Reclamation Methodology 4-4 <br /> 4.4.1 Topsoil Salvage 4-4 <br /> 4.4.1.1 Topsoil Salvage Monitoring Plan 4-3 <br /> 4.4.2 Topsoil Replacement 4-9 <br /> 4.4.3 Topsoil Preporation 4-3 <br /> 4.4.4 Seeding Mixtures 4-9 <br /> 4.4.5 Methods of ?laming 4-13 <br />• 4.5 Site Specific Reclamation Procedures 4-20 <br /> 4.5.1 Surface Facilities Site 4-20 <br /> 4.5.2 Roads 4-21 <br /> 4.5.3 Diversion and Collection Ditches and Impoundments 4-21 <br /> 4.5.4 Temporary Surface Management Plan 4-22 <br /> 4.5.5 Revegetation Maintenance 4-22 <br /> 4.5.6.1 Riparian Areas 4-23 <br /> 4.6 Evaluation of Reclamation Success ~ 4-29 <br /> 4.6.1 Rangeland Reclamation Success 4-29 <br /> 4.5.2 Reference Area Management Plan 4-31 <br /> 4.6.2.1 Dry t4eadou Reference Area Management Plan 4-31 <br /> 4.6.3 Reclaimed Area Monitoring Pian 4-37 <br /> 4.6.4 Grazing Success 4-37 <br /> 4.6.5 Agricultural Monitoring Plan 4-37 <br /> 4.7 Abandonment 4-33 <br /> 4.7.1 Mine Area 4-39 <br />• 4.7.2 Shafts, Vents <br />` <br />' 4-50 <br /> 4.7.3 rlel <br />_s 4-50 <br />