My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-17_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2007-09-17_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:08 PM
Creation date
11/22/2007 1:36:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
Revision
Doc Date
9/17/2007
Doc Name
Reclamation permit application form
From
Elam Construction, Inc.
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D (Amendment) -MINING PLAN <br />The following describes information specific to the proposed amended area to be <br />mined. More general information is found in Exhibit D of the original permit <br />application and is referenced herein. <br />It is important to note that currently there is a buffer east of the Hilliard property <br />boundary in the original permit. This buffer was intended to provide some relief to <br />the Hilliards from the ensuing operations at Agri- DLD in 2000. In light of the <br />gravel lease agreement with the Hilliards, it is no longer necessary to maintain <br />this buffer. Therefore, it is proposed that this buffer area be eliminated and that <br />mining continue seamlessly to the west. <br />(a) The method of mining will be consistent with the current operation. This <br />primarily is with the use of a front-end loader with initial pit run haulage by <br />rock truck or earthmover to the existing process area. Once an area is <br />mined sufficiently to provide an auxiliary process site, haulage may be <br />eliminated. <br />(b} Topsoil and overburden, to the extent they are present, will be removed <br />with either afront-end loader or earthmover (scraper). <br />(c) Other than stormwater containment, no diversion or impoundment of water <br />is anticipated. <br />(d) It is anticipated that 25 acres or less will be mined at any given time <br />beginning at the east end and progressing west. <br />(e) It is expected that a 10 acre area will be mined out in 2 to 3 years; the <br />actual mining limits contain approximately 52 acres. Thus mining will take <br />place over 10-15 years depending on demand. <br />(f) The nature, depth and thickness are anticipated to be the same as <br />described in the original permit application (Exhibit D orig.). <br />(g) (See Exhibit D orig.) <br />(h) (See Exhibit D orig.) <br />(i) No explosives will be used in conjunction with mining. <br />
The URL can be used to link to this page
Your browser does not support the video tag.