Laserfiche WebLink
~, <br />Randall P. Price <br />( November 25, 1991 <br />Page 2 <br />V. Updates concerning topsoil are addressed on the Surface Facilities Map (Map 52) <br />and in the Reclamation Plan Text. <br />VI. Surface Hydrology information is contained on the Drainage Control Map (Map <br />53) and in the Operations Plan, Section 2.05-3(4). <br />VII. '~'he.bond has been recalculated_and is~contained'in:Section:2.05:4(2~ <br />I. The permit boundary is contained on the Surface Facilities Map (Map 52) which <br />shows the I.oadout Facility within the permit boundary. <br />II. The small area exemption for the Sylvester Gulch Fan site is discussed in the <br />Drainage Control Plan, Section 2.05.3(4). <br />Please review the updated permit document and contact me should you have questions. <br />I am very pleased with MCC's new Permit and trust you will be the same. <br />Sincerely, <br />~ 4G~ Q <br />Kathleen G. Welt <br />Environmental Engineer <br />cc: J.L Coffey <br />J.D. Miller <br />R.D. Pick <br />