Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />E~~.4 <br />Coa/Company Seneca Coal Company <br />September 24, 1997 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 ~FCF~UCC <br />Denver, CO 80203-2273 <br />RE: Seneca II-W Mine Permit C-82-057, TR28 SEP 2 9 1J9i <br />Dear Ms. Crosby: ~'b-~.i~~n~ ~ ~.~~~~r~m~r•.' C'oob~, <br />Enclosed please find three copies of an application for TR28 to <br />the Seneca II-W Mine Permit C-82-057. This technical revision <br />changes the postmining topography in the 006 Gulch along the <br />• southwest cropline in the A pit. <br />Seneca is proposing to backfill a portion of the 006 Gulch <br />directly adjacent to the cropline boxcut in the A pit. Figure No. <br />1 is attached showing the typical boxcut cross section in this <br />area, with the proposed postmining surface. The original slope in <br />this area down to the 006 Gulch is nearly vertical. As is shown <br />in Figure 1, this slope would have been disturbed by the boxcut <br />anyway, yet would have been impossible to reclaim without <br />disturbing in the gulch itself. By backfilling this portion of <br />the 006 Gulch, Seneca will be able to reclaim this area with a <br />resulting, and much safer and stable 4:1 postmine slope. The <br />volume calculations were not changed in Tab 20, because no <br />additional amount of overburden is being removed. The actual <br />postmining topography in this area has been rearranged to <br />accommodate this revised slope. Approximately 250,000 cubic yards <br />have been shifted to accomplish the revised topography, as well <br />as maintain the approximate original contour for this area. <br />The exhibits containing the pre and post mining cross sections <br />for S-5 and S-6 have been updated to show the new configurations. <br />The post mining stream channel profiles for 006 Gulch and 006-SE1 <br />have also been revised based on the appropriate modifications. <br />The postmining drainage channel designs were not affected for <br />either of the two drainages, which are contained in Attachment <br />• 20-1. <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276014 <br />