Laserfiche WebLink
Geology ~E°~ t9 o t 1 m <br />May 14, 2003 <br />Division of Minerals and Geology <br />1313 Sherman Street, RM 215 <br />Denver, CO 80203 <br />Holcim (US) Inc. <br />Building A <br />4629 North Overland Trail <br />P.O. Box 1468 <br />LaPorte, CO 80535 <br />Attn: Barbara D. Chiappone / <br />Re: Technical Revision to Permit # M-1977/347 Slab Canyon Quarry <br />Dear Ms Chiappone, <br />Phone 970 482 5600 <br />Fax 970 482 5608 <br />www.holcim.com/us <br />~iECEOVED <br />MAY 162003 ~ <br />Division N Minerals and Geology <br />~p_ol~ <br />In response to your letter dated April 24, 2003, Holcim is submitting the following documents to <br />complete their request for a technical revision. <br />1) Succession of Oaerators: One each copy of the fully executed Performance Warranty in the <br />name of Holcim (US) Inc. This original of this document was submitted to you on August 27, <br />2002, as can be noted from the attached cover letter that accompanied the performance <br />warranty. . <br />2) Technical Revision: Enclosed is another copy of the Technical Revision request as required <br />by the May 3, 2002 DMG Bulletin along with a check for the additional $38.00 that is required by <br />the revised fee schedule. <br />Yours s' cerely <br />i t~~ <br />ordon Benton <br />Project Manager <br />Enclosures <br />cc: W. Townsend w/o <br />R. Moir " <br />K. Shanteau " <br />