Laserfiche WebLink
FELSBURG <br />~i H O LT & <br />ULLEVIG <br />engineering paths to transportation solutions <br />April 25, 2005 <br />Mr. Carl Luppens <br />Nordic Land Company <br />One South Dahlia Street <br />Denver, Colorado 80246 <br />RE: King Mountain Gravel Mine <br />Routt County, Colorado <br />FHU Reference No. 05-079 <br />Dear Mr. Luppens: <br />At your request, Felsburg Holt & Ullevig has investigated traffic and roadway aspects of the <br />proposed King Mountain Gravel Mine, located to the west of Toponas in Routt County, <br />Colorado. We visited the site and reviewed the roadway network in the field on April 20, 2005. <br />We have also reviewed various documents that have been provided to Routt County related to <br />the proposed mine and have researched other documents related to gravel roads. <br />Two documents are particularly important to this review: the memorandum to the Planning <br />Department prepared by Ms. Heather R. McLaughlin (Assistant Routt County Engineer) on <br />February 23, 2005 and the traffic impact study (King Mountain Sand and Gravel Mine. Routt <br />County. Colorado) prepared by LSC Transportation Consultants, Inc. on March 8, 2005. This <br />edition of the traffic report is based on 100,000 tons of aggregate per year, whereas an earlier <br />version (February 8, 2005) was based on 250,000 tons per year. Our review of the two LSC <br />reports shows that the sRe-generated traffic has been proportioned down to 40°k of the previous <br />forecasts. <br />In general, our investigations confirm the recommendations contained in the McLaughlin <br />memorandum. These recommendations include widening and paving CR 5 and replacing two <br />existing, substandard bridges. Although not specifically mentioned in the McLaughlin <br />memorandum, improvements are needed at the CR 3/CR 5 intersection. The analyses of the <br />LSC study appear to be generally correct but are limited to the intersection of SH 131 and CR 5. <br />We believe that a left turn acceleration lane should be considered at the intersection of SH 131 <br />and County Road (CR) 5 in addition to other recommended improvements. In addition, we have <br />questions about the current level of mine activity, based on our field visit. <br />SH 131/CR S Intersection <br />The focus of the LSC traffic impact study is solely on the intersection of SH 131 and CR 5. The <br />study does not address traffic impacts or improvement needs on CR 5. The forecasting <br />methodology and analyses found in the LSC study are generally sound and conservative. LSC <br />conducted peak hour turning movement counts at the SH 131/CR 5 intersection and counted <br />traffic on CR 5 (83 vehicles per day) in September 2004. Colorado Department of <br />Transportation (CDOT) traffic records show a 2004 annual average daily traffic (AADT) volume <br />of 1,400 vehicles per day (vpd) on SH 131 south of the SH 134 intersection and 900 vpd north <br />6300 South Syrncuse Way, Suite 600 Centennial, CO A0111 rel 303.721.1440 fax 303.7? L0332 <br />u~~.Flturng.com infuCatlhurn~.aror <br />