<br />Coal Ridge No. 1 Mine <br /> <br />Mid-Term Bond Summary , ~3 O ~~ U <br />Item NCEC MLRD ~ ~~'ll <br />Portal Sealing ~ 8,000 5,555 <br />Facilities Removal 19,138 223,056* <br />Stowing Refuse in Mine 25,204 - <br />Backfilling and Grading 71,448 28,994 <br />Sediment Control Removal In B 8 G 5,323 <br />Topsoil Replacement 85,494 44,591 <br />Fine Grading - 3,066 <br />Revegetation 36,426 29,281 <br />Operating Costs 13,534 - <br />Mobilization - 4,476 <br />Total Direct Cost 277,477 344,342 <br />Total Indirect Cost - 66,930 <br />Total Cost 277,477 411,272 <br />tiv <br />*Note: Rail spur direct and indirect costs account for~roximately <br />E150,000,00 of this total. <br />VI. H drolo is Monitorin <br />Y 9 9 <br />~. <br />See separate letter to NCEC referencing the mid-term and 1986 Annual <br />Hydrologic Report. <br />VII. Exploration Drillin <br />Several exploration sites and drill holes were permitted by the Storm King <br />Corporation. The Division will need to inspect these sites to determine if <br />bond can be released. NCEC must submit information showing the status of <br />these drill holes, including methods of plugging. The numerous drill holes <br />placed for foundation studies of the refuse area should also be included in <br />this report. <br />VIII. Summary <br />The permit application, although needing revision for clarification, is valid <br />except for the fallowing issue. <br />The loadout as presented in the permit application is approved. However, if <br />implemented in this permit term would require a revision to the reclamation <br />plan fora disposal area for the rock ballest from the rail spur, A1s~, <br />according t~ the Division's calculations, NCEC would need to post additional <br />bond to cover reclamation of the rail spur. <br />/vjr ' <br />8053E <br />