Laserfiche WebLink
<br />r MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />7313 Sherman SI.. Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />Fnx~303 632-8106 <br />O_FQ~~f~ <br />Ne/ \ <br />+*1~ 1~4~1 ~'.e <br />~ re76 ~ <br />Roy Romer, <br />Govenwr <br />Michael B. Long, <br />Division Director <br />MINING PERMIT - COAL <br />TECHNICAL REVISION DECISION FORM <br />The Mined Land Reclamation Division, Department of Natural Resources, State of <br />Colorado has proposed the decision stated below. The decision will become <br />effective upon the termination of the ten (10) day public comment period, <br />pursuant to Rule 2.08.4(5)(b)(ii). <br />Permit No.: C-81-028 Technical Revision No.: 26 <br />Submittal Date: June 2, 1992 Decision Date: September 9, 1992 <br />Revision Decision Type: Approved <br />Minel: Keenesburg Strip Mine <br />Permittee: Coors Energy Co. <br />Description of Revision: 25-Year/24-Hour Calculation, Sediment Pond 2 <br />Change in Bond Amount: No Change <br />Disturbed Area (+/-) .0 Ac. <br />Affected Area (+/-) .0 Ac. <br />Federal Land (+/-) .0 Ac. <br />Revised Application Pages _ <br />PERMITTEE2 <br />zed Representative <br />DATE: <br />Area Changes <br />Max. Disturbed Area (+/-) .0 Ac. <br />Permit Area (+/-) .0 Ac. <br />State Land (+/-) .0 Ac. Private Land (+/-) .0 Ac. <br />32 a-h Revised Maps None <br />MINED LAND RECLAMATION DIVISION <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />Au horiz Representative <br />DATE: ~ /~5~2 <br />Stipulations Attached Yes No _( <br />lIf this action pertains to a federal mine <br />permittee must send copies of the approved <br />listed on the Federal Agency Mailing List. <br />the revision must be sent certified mail t <br />Avenue SW, Albuquerque, New Mexico 87102. <br />all copies have been sent. <br />STATE OF COLORADO <br />(coal or surface ownership) the <br />technical revision to the agencies <br />For non-Federal mines 1 copy of <br />~ OSM at Suite 310, 625 Silver <br />The project may not proceed until <br />25ignature is required if stipulations are attached. <br />9225G <br />