My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV106229
DRMS
>
Back File Migration
>
Revision
>
REV106229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:20:55 AM
Creation date
11/22/2007 1:33:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
RELEVANT SECTIONS FROM FINAL REPORT CRESSON PROJECT QUALITY ASSURANCE MONITORING AND TEST RESULTS
Type & Sequence
TR33
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
previous seam by a[ least two (21 inches. Reseaming over an existing seam without <br />regrinding shall not be permitted. <br />F. Each repair shall be non-destructively tested, except when MANAGER and CERTIFYING <br />ENGINEER require a destructive seam sample obtained from a repaired seam. Repairs <br />that pass the destructive test shall be taken as an indication of an adequate repair. <br />Failed tests indicate that the repair shall be repeated and retested until passing tes[ <br />results are achieved. <br />Recording the Results: Daily documentation of all non-destructive and destructive <br />testing shall be provided to MANAGER by CQA Monitor. This documentation shall <br />identify alt seams that initially failed the test and include evidence that these seams <br />were repaired and successfully retested. <br />3.11 CONFORMANCE TESTING: <br />A. During manufacturing of the geomembrane, CCW Monitor will be present to observe <br />manufacturing of geomembrane and will ensure that samples are obtained and <br />forwarded to the Quality Assurance Testing Laboratory for testing to ensure <br />conformance with the SPECIFICATIONS. <br />B. Samples will be taken across the enrire width of [he roll and shall not include the first <br />three (31 feet. Unless otherwise stated, samples will be three 431 teet long by the width <br />of the roll. COA Monitor will mark the machine direction on the samples with an arrow. <br />Unless otherwise stated, samples shall be taken at a frequency of no less than one per <br />one hundred fifty thousand (150,000) square feet. As a minimum, the following tests <br />will be performed to verify conformance to the design SPECIFICATIONS with minimum <br />values specified in Section 2776, Article 2.01.: <br />PROPERTY TEST METHOD <br />Thickness (mils) GRI-GM8 <br />Compound Density Iglccl ASTM D1505 <br />Tensile Strength (Both <br />yield and ultimate <br />strength and elongation, <br />as speeifted) ASTM D638 <br />Carbon Black Content (%) ASTM D1603 <br />3.12 PLACEMENT OF SOIL OR GRANULAR MATERIALS <br />All soil materials located on top of a geomembrane shall be placed in such a manner as to ensure: <br />A. The geomembrane and any underlying geatextila is not damaged. <br />l3. Minimal slippage of the geomembrane on underlying layers occurs. <br />C. Minimal movement and wrinkling or folding of the underlying geosynthetics layer(sl occurs. <br />D. No excess tensile stresses shall occur in the geomembrane, such as by earth moving equipment <br />March 2B, 1998 Section 02776.0 <br />02776.0-23 Geomembrane <br />Revision 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.