My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV106219
DRMS
>
Back File Migration
>
Revision
>
REV106219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:20:54 AM
Creation date
11/22/2007 1:32:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
4/23/1987
Doc Name
TR33 CONSTRUCTION OF NEW ASHMORE PIT HAUL DRAGLINE WALK ROAD & ASSOCIATED ACCESS ROADS
From
TRAPPER MINING INC
To
MLRD
Type & Sequence
TR33
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3. Topsoil Replacerent Calculations for Access and Haul/Walk Road <br /> Iit-Place imse Average Average Cycle <br /> Topsoil Topsoil Retopsoil Haul Total Average Time Time <br /> Volure Volure Area Distance Resistance Speed Minutes (hours) <br />Frrnr-To (yd3) (ya3)(1) (Acres) (ft) (X)(2) (MPH)(3) (4) (5) <br />Roadside TS/lower "A" Road 3,050 - 5.6 20.56 3.93 <br />Lower "A" Road/Roadside TS 3,050 +11.6 13.16 2.83 <br />Totals 27,749 33,299 17.2 6.76 108.48 <br />Roadside TS/rower "A" Road 1,800 + 2.1 19.97 3.23 • <br />Lower "A" Road/Roadside TS 1,800 + 3.9 26.66 0.96 <br />Totals 77,682 93,218 32.1 4.19 188.23 <br />105,431 126,517 49.3 <br />(1) hose Volume = (In-place volume) x (Swell Eactor of 1.20). <br />(2) Average Total Resistance (X) = rolling resistance plus grade resistance <br />(3.OY<) + or - (% grade fran profiles). <br />(3) Productim rates fran Caterpillar Performance Handbood edition 15. <br />(4) Cycle time include 1.5 mirutes to load, 0.7 minutes to ditnp aid 0.2 minutes spot time. <br />(5) Time = (Loose To soil Volume) <br />50 minutes per hour cycle tyre x 1.5 ICY Load Factor <br />Topsoil Replacanent Croplacd 108.48 hours x $273.06/hour = $29,621.55 <br />Topsail Replacerent Rangelanj 188.23 hours x $273.06/hour = $51,398.08 <br />~'Popsoil Rate $273.06/hour <br />Total Topsoil Replacenent Cost $81,019.63 <br />296.71 <br />lJ <br />* Topsoil Rate fran Revision PR-1, Attac}ment 3.5 , <br />4/16/87 LWH/mg/jb <br />
The URL can be used to link to this page
Your browser does not support the video tag.