Laserfiche WebLink
<br />• <br /> <br />Table 1. Total Bond Costs for the North Ashmore Pit Haul/Walk Road and <br />Associated Access Roads. <br />Calculated <br />Activity Cost <br />1) Regrade of access and haul/walk road $ 29,850.12 <br />2) Topsoil replacement for access and haul/walk road 81,019.63 <br />3) Revegetation cost for access and haul/walk road 9,831.00 <br />Subtotal $120,700.75 <br />4) Indirect Costs: <br />Public liability insurance (0.8%) 966.00 <br />Contractor performance bond (0.7%) 845.00 <br />MLRD administration expense (5%) 6,035.00 <br />Contractor profit (10Y,) 12,070.00 <br />*Contractor Superintendent --- <br />Subtotal $ 19,916.00 <br />Total $140,616.75 <br />* Unchanged from PR-1. <br />4/23/87 <br />LWH/mg/jb <br />