My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV106218
DRMS
>
Back File Migration
>
Revision
>
REV106218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:20:54 AM
Creation date
11/22/2007 1:32:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2001
Doc Name
HYDROLOGICAL ANALYSIS FOR PORTIONS OF THE BATEMAN CREEK WATERSHED
Type & Sequence
TR39
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i • <br />Zoo, _,_ <br />1.0 INTRODUCTION <br />003-2142.6 <br />A hydrological analysis was conducted by Golder Associates Inc. (Golder) to evaluate the <br />surface water flow routing for the following ponds at the Cresson Mine: <br />- Bateman Creek detention pond; <br />- Arequa Gulch sedimentation pond; <br />- Crusher sedimentation pond; and <br />- BMP sump. <br />Contained herein are the hydrologic calculations for routing surface water flows into the <br />ponds and diversion ditches. The hydrologic calculations were conducted using the HEC-1 <br />(Hydrologic Engineering Center, 1990) model using watershed delineations and curve <br />numbers developed for the mine site. <br />2.0 HYDROLOGIC ANALYSIS SUMMARY <br />The hydrologic model was run to simulate the stormwater run-off from the 100-year, <br />24-hour; and the 10-year, 24-hour storm events. The Bateman Creek detention pond is <br />designed to attenuate the 100-year peak flow. The Crusher and Arequa Gulch sedimentation <br />ponds and the BMP sump are designed to contain two times the runoff volume of the <br />10-yeaz, 24-hour storm event. The hydrological analysis for the 100-year, 24-hour storm <br />event, that includes the Bateman Creek detention pond, and Arequa Gulch and Crusher <br />sedimentation ponds, and BMP sump is presented in Appendix A. The hydrologic analysis <br />for the ]0-year, 24-hour storm event to size the Crusher and Arequa Gulch sedimentation <br />ponds and the BMP sump is also presented in Appendix A. <br />Drawing 1 presents the sub-basin delineations used for the hydrological analyses. Flow <br />arrows presented on Drawing 1 show the general direction of routing of surface water. The <br />i ~aa¢ iazV ia2BArEMnN2 DoC Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.