Laserfiche WebLink
<br /> <br />ESTIMATING FORM - REVEGETATION 40RK cont'd <br />B. SHRUB 6 TREE TRANSPLANTS <br />___________=====c=====_ ____= I ~ MATERIAI:~ PLANTING: I E/PERT. ~ TOTAL I TOTAL <br />SPECIES NAME ~ OUAN./ACRE ~ STOCK TYPE 8 SIZE I S/PLANT I E/PLANT ~ PELLET I E/PLANT ~ S/ACRE <br />______________ e===== ~___=====cc== ~==______=====c=====°c=c==~ =_________~ ____________ ~__________ ~°_____~ -~__ ___________ <br />Narrowleaf cottonwood ~ 3 ~ Tub[ing... 10-73 cu. in. ~ 50.72 ~ 50.60 ~ 51,74 ~ 53.06 ~ 59.78 <br />Skunkbush sumac ~ 5 ~ Tubling.. . 10.13 cu.in. ~ 50.72 ~ 50.60 ~ 51.74 ~ 53.06 ~ 515.30 <br />Choke cherry ~ 5 ~ Tubling.. . 70-13 cu.in. ~ 50.72 ~ 50.60 ~ 51.74 ~ 53.06 ~ 515.30 <br />River birch ~ 5 ~ Tubling.. . 10.13 cu.i n. ~ 50.72 ~ 50.60 ~ 51.74 ~ 53.06 ~ 515.30 <br />- <br />Total <br />transplant <br />cost/acre: <br />555.08 <br />C. SEEDBED PREPARATION <br />_______________________ = ___________ <br />_______________________ <br />Tilling method #1: <br />disc harroui ng •• <br />596.80 <br />#2: <br />D. SEED APPLICATION <br />-------------------- <br />-' --------------- <br />Seeding method: drift seeding * <br />E. FERTIL121NG <br />___ ___________ FERTILIZER / SOIL AMENDMENT ~ UNITS/ACRE ~ UNIT ~ E/UNIT ~ E/ACRE <br />_________________________________________________ ____ <br />Materials used #1; 6.24.24, 10-20-70, 15.15-15 + ~ 200.00 ~ pound ~ 50.16 ~ 532.00 <br />#2: <br />#3: <br />--------- -- - ---- ------------- <br />Total materials cost/acre• 532.00 <br />Application method #1: tractor drawn broadcast spreader ** EZ0.91 <br />#2: <br />Total application cost/acre: 520.91 <br />F. MULCHING ------- <br />_______===e= <br /> <br />Filename X020-7 sheet 2 of 2 <br />Total cost/acre: 596.80 <br />Total cost/acre; 560.23 <br /> MULCH / RETYING / OTHER MATERIALS I UNITS/ACRE ~ UNIT ~ E/UNIT ~ E/ACRE <br /> =ace====e====c=====_=====0=°°=======cec==°===Ce=O~ _____=====e= ~===_______~_________ ~====zeev=_ __ <br />Materials used #1: straw (delivered) - ton * ~ 2.00 (ton ~ 575.28 ~ E150.Sd <br />#2: <br />#3: <br />#L: <br /> Total materials cost/acre: ~ 5150.56 <br />Application method #1: power nnrlcher (hay spr. 1" deep) ** 560.11 <br />#2: crimping (with tractor) * 547.41 <br />ili: <br />G. JOB COST <br />Total area to be seeded: <br />Estimated failure rate: <br />10.00 acres. Total E/acre <br />40.00% of area. Total E/acre• <br />* Reseeding cost items: A C D E F <br />Total application cost/acre: 5101.52 <br />8536.16 Total Initial Job Cost= 55,361.58 <br />5481.08 Total Reseeding Costs = E1, 924.31 <br />GRAND TOTAL JOB COST = 57,285.89 <br />