Laserfiche WebLink
Illllllllllllllllll • • ~5L <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone: (3031 866-3581 <br />FAX: (303) 866-3589 <br />RECL~'a'~~ <br />OCT 3 C 2CQ1 <br />pF Cor <br />ti~ pR <br />~O <br />„~i O <br />• ~ rB]6 f <br />httplhvalerslale.torus/de(ault.hlm <br />Division of Minerals and Geology <br />Response to Reclamation Permit Application Consideration <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office; District 64 Water Commissioner <br />FROM: Claudia Engelmann, Water Resource Engineer C.~1 <br />DATE: October 30, 2001 <br />RE: Guenzi S & G Pit, File No. M-1987-159 <br />Section 2, Twp 2 N, Rng 54 W, 6th P. M., Logan County <br />Operator: Logan County <br />Contact: Ken Strohson, County Planner <br />Logan County <br />315 Main St. <br />Sterling, CO 80751 <br />(970) 522-0888 <br />gill Owenr <br />Governor <br />GregE Watcher <br />Executive Ducaor <br />Hal D Simpson, P.E. <br />Slate Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: <br />