My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV106211
DRMS
>
Back File Migration
>
Revision
>
REV106211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:20:54 AM
Creation date
11/22/2007 1:32:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
11/5/1993
Doc Name
NEW ELK MINE PN C-81-012 BASIN RESOURCES INC PERMIT RENEWAL 2 PRELIMINARY ADEQUACY REVIEW
From
DMG
To
BASIN RESOURCES INC
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1113 Sherman Si., Room 215 <br />Denver, CO 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 8328106 <br />November 5, 1993 <br />Mr. Ralph Lopez <br />Environmental Engineer <br />Basin Resources, Inc. <br />14300 Highway 1 2 <br />Weston, CO 81091 <br />• <br />STATE OF COLORADO <br />of ~Oto <br />,~~_ 4 <br />Few <br />r, ~ <br />.•'r~; <br />Roy Romer <br />Governor <br />Michael8 Long <br />Division Director <br />Re: New Elk Mine, Permit No. C-81-012, Basin Resources, Inc. <br />Permit Renewal No. 2, Preliminary Adequacy Review <br />Dear Mr. Lopez: <br />The Division is reviewing the permit application for the New Elk Mine for Permit Renewal No. 2 <br />and has the following questions or comments: <br />A. Operations <br />1. Please describe Basin Resources' plan for bringing the garage oil facility, located just <br />west of the industrial building, into compliance with the SPCC plan. <br />2. Please address the potential for spontaneous combustion at the coal stockpiles at <br />New Elk. Please include the causes of spontaneous combustion in your assessment. <br />3. Please describe the methods that Basin Resources has and will implement in order to <br />keep air particulates from the coal stockpiles and from the mine site in general in <br />compliance with the air emissions permits. Please include haul trucks on Highway 12 <br />in your discussion. <br />4. What is the status of the two air shafts and the road leading to them? Is the road used <br />solely for access to those air shafts? <br />5. Please develop a list of the hazardous materials on site, where they are located and <br />how they are stored. <br />B. Hydrology <br />1. What is the status of Basin Resources' efforts to obtain a stormwater plan for <br />New Elk? <br />2. Has water monitoring data confirmed the predictions of the New Elk Mine PHC and <br />CHIS? Please elaborate. Include the AVF in your analysis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.