Laserfiche WebLink
• ~ iii iiiiiiiiiiiii iii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Rewurces <br />1313 Sherman $1., Rnom 21 5 Iii~~ <br />Denver, Colorado 80203 II <br />Phone: 13031 866-7 567 <br />FAX:13031872-8106 <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />March 4, 1996 <br />Roy Romer <br />Gavemnr <br />Mr. Don Koehn lames Eochhead <br />PYOWBrS County Executive Dkeaor <br />P .0. Box 1 D46 Michael 8. Long <br />Lamar, CO 81052 DIVISIOn Dveclor <br />Re: Jones East Pit, Succession Approval, Permit No. M-87-009, Revision No. <br />SO-001 <br />Dear Mr. Koehn: <br />On Febru,sry 29, 1996 the Colorado Mined Land Reclamation Board approved the <br />successil7n of operators from Carder Inc. to Prowers County for this <br />operation. Prowers County is now the permitted operator of the Jones East <br />Pit, and as such, is responsible for all provisions in Permit No. M-87-009, as <br />well as those specified in the;.Minerals Rules and Regulations. Carder Inc. is <br />relieved of all responsibilities concerning this operation (See Mineral Rules <br />and Regulations Number 1.12). <br />The Division would like to remind you, as the permitted operator, about a few <br />things we feel are important: <br />1. All of the application materials, as amended and supplemented, are an <br />integral part of your permit. They have been incorporated into the permit by <br />reference. We presume that you have a copy of all of these materials; <br />thereforf,, none have been enclosed with this mailing. We suggest that you <br />keep a copy of the permit and the permit application at the mining operation <br />as a reference for operating personnel, to help ensure compliance with the <br />terms of the permit. <br />2. CY~anges in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Mineral Rules and Regulations and/or contacting us to determine <br />if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule l.ll to Conversions. <br />3. On your permit anniversary date each year, you must submit an annual <br />fee and annual report to us. Please consult Rule 1.15 for 110 Mineral <br />Permits, Rule 2.4 for 112 Permits, and Statute Section 34-32-116(1)(a) for 111 <br />Permits, for the specific annual report requirements applicable to your mine. <br />