Laserfiche WebLink
10-27-1997 11 :5dAM FROF1 ENG. WEST ELK t`1INE 97fd 9295050 <br />• <br />Mountain Coal Company <br />West Elk Mine <br />Past Office Box 597 <br />Somerset, Colorado 97434 <br />Telephone 914929-5 01 5 <br />October 24, 1997 <br />Mr. Michael Boulay <br />Colorado Division of Minerals and Geology <br />1313 Shertnan Street, Room 215 <br />Denver, CO 80203 <br />RE: Technical Revision No. 81 (Lone Pine Pond); West Elk Mine; <br />Permit No. C-80.007 <br />Dear Mike: <br />P. 2 <br />III IIIIIIIIIIIII III <br />999 <br />Mountain Coal Company (MCC) has reviewed the Division's adequacy questions <br />~ regarding the above referenced technical revision application and provides the <br />following additional information. <br />l . The mine water to be discharged into Lone Pine Gulch, either from the pond or <br />directly from the pipeline, is discussed in the revised PHC (TR#80) currently <br />tinder review by the Division. <br />2. Upon completion of the pond construction, MCC will typically direct all of the <br />mine water to the pond. Any discharge, whether from the pond or directly from <br />the pipeline, will be sampled and analyzed to determine compliance with <br />NPDES discharge parameters. <br />3, MCC is unsure as to the observed instability of Highway 133 downslope from <br />the pond location to which the Division is referring. The North Fork of the <br />Gunnison River is located between the Lone Pine pond and State Highway 133, <br />as shown on Map 53A, Regardless, the liner will be installed prior to use. <br />4. The revised total topsoil calculation on Table 36 was incorrect. The total has <br />been revised as discussed in the response to question #5. <br />5. MCC has recalculated the azea of disturbance associated with the construction <br />of the pond to be 2.2 acres. Therefore, it is expected that approximately 3,500 <br />CY of topsoil will be stripped and stockpiled. For expediency, MCC will not <br />object to the Division's use of the higher volume that was calculated by the <br />Division for the bond estimate. MCC will provide as-built voltunes following <br />the construction of the pond. <br />