My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-02-14_REVISION - M1994096
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994096
>
2005-02-14_REVISION - M1994096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:05:59 PM
Creation date
11/22/2007 1:32:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994096
IBM Index Class Name
Revision
Doc Date
2/14/2005
Doc Name
Cost Estimate
From
DMG
To
File
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br /> <br />Haullna Caoaclty shcol 2 of 2 <br />Scraper Payload (weight) Basis : I Scraper Bowl (volume) Basis <br />Malodal vrelghl : 2, !00 pounds)LCY Struck volume : f4.00 LCY <br />Matedal descnpUon : Hoaped volume : 2U.U0 LCY <br />Furth - Luarrr _ <br />Avorage volume : 17.UU LCY <br />Rated payload : 48,000 pounds AdJusted capacity : 17.00 LCY "• <br />Payload capacity : ?2.86 LCY ••• rwu~rr cMed~: non rn9xis .ohnny ~r aro{wr Pa. a, puv!, ri,: i ~rxW~ln <br />Cycle Time : Job Condition Corrections : Sitn altitude (fl) : 5,430 <br /> l Scraper Push dozer Source <br />Scraper loading Umo' : 0.50 minutes AlUlude adj. _ f 000 1.OU0 (Cat NBl <br />Maneuver and spread time : 0.60 minutes Job efficiency :. 0.83U 0.830 (Cat HB) <br />•,oaa rime cxr ncrapm pnv an a,nn.ruu melon Nut rorrecUOn : 0 830 0.830 <br />travel Ume : - -' <br />Road rondlUOn description : RuMed dirt, little mein(enance, no wulort 2" (ve penon,rtnx, <br />Illln~l(e5 <br />• I ~ -_ <br />•' Vaval Lma br each aspmant 4 agv~red ror acceiaaawvdaekraunn Return Umo : <br />0.3B <br />minutes <br />_ <br />tgC10 v01gc1(pe qro man. gttnlnaDb Da blal rgnintancn Mown. rwl avgr3Sp <br />Total sr:rapor team cycle limo (load + haul .maneuver and spread + return) 1.89 minutes <br />UnadJusled unit productloNhour : 543.10 LCY/hour "' Adjusted for job conditions : 450 77 LCYfiour <br />Optimal number of scrapers per push dozer : 2 Selected numbor of scrapers : 7 scmpor(s) <br />AdJusted single scrapor team (unit) hourly productlan 9tl! 55 LCV/hour <br />Adjusted multiple scraper foam (UeoQ hourly production 901.55 LCYrhour <br /> <br />JO8 71ME AND COST <br />Fleet sizo : 1 Team(s) Total Job time : 13.42 liours <br />Urnt cost 50.576 /LCY Total Joh cost : 56,972 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.