Laserfiche WebLink
ESTIMATING FORM - REVEGETATION VORK cont'd Filename M573-2 sheet 2 of 2 <br />B. SHRUB 8 TREE TRANSPLANTS <br />____________________________ I I MATERIAL:I PLANTING: I f/PERT. I TOTAL I TOTAL <br />SPECIES NAME ~ WAN./ACRE ~ STOCK TTPE 8 512E ~ f/PLANT ~ f/PLANT ~ PELLET ~ f/PLANT ~ f/ACRE <br />No transplants requi red ~ ~ ~ ~ ~ ~ (0.00 <br />Total transplant cost/acre: (0.00 <br />C. SEEDBED PREPARATION =___________ <br />Tilling method if1: disc harrowing •• <br />art: <br />D. SEED APPLICATION <br />Seeding method: drill seeding <br />S%.80 <br />Total cost/at re: (96.80 <br />____________ <br />Total cost/acre: 560.23 <br />E. FERTIL121NG <br />_______________ FERTILIZER / SOIL AMENDMENT I UNITS/ACRE ~ UNIT I f/UNIT ~ f/ACRE <br />Materiels used F1: superphosphate (0-20-0 w/72X S) • ~ 40.00 ~ pound ~ (0.14 ~ (5.60 <br />#2: amronium nitrate (33-0-0) • ~ 40.00 ~ pound ~ 50.21 ~ (8.40 <br />Y3: <br /> Total materiels cost/acre: 514.00 <br />Application method /1: herd held broadcast spreader * (107.63 <br />i12: <br />F. MULCHING <br />Total application cost/acre: (101.63 <br /> MULCH / NETTING / OTHER MATERIALS ~ UNITS/ACRE ~ UNIT ~ 2/UNIT ~ f/ACRE <br />Materiels used k7: strew (delivered) - ton • ~ 2.20 ~ tan ~ f75.28 ~ f765.62 <br />k2: <br />M3: <br />~4: <br /> Total materiels cost/acre: (165.62 <br /> <br />Application method M7: <br />teckifier spraying • - ----------- <br />f1B8.27 <br />N2: <br />i13: <br />Total application cost/acre: f7BB.27 <br />G. JOB COST =___________ <br />Total area to be seeded: 86.82 acres. Total f/acre f668.56 Total Initial Job Cost= f58, 044.34 <br />Estimated failure rate: 30.OOX of area. Tatel S/ec re• (668.56 Total Reseeding Costs (17,473.30 <br /> • Reseeding cost items: A C D E F GRAND TOTAL JOB COST = f75,457.64 <br />