Laserfiche WebLink
<br />RECLAMATION COST SINMIARY cant'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (S) <br />Subtotal (K): <br />L. DRILL MOLE/MONITORING YELL SEALING <br />Task <br />..___ No.~ <br />__.I__ Task Description <br />_____________~.-_~.~______._______.. ~ Lost (S) <br />.______I.._____.r <br />Subtotal (L): <br />N. MISCELLANEOUS RECLAMATION TASKS <br />iesk No.~ Task Description ~ Los[ (f) <br />4 ~ removal of 2460 lin feet of conveyor ~ f7S,800 <br />5 ~ Demolitionf ive concrete slabs ~ (19,000 <br />6 ~ Seeding 86.82 acres ~ 575,476 <br />Ferc ing <br />7 ~ Mob/Demob tro d8n dozers ~ (3,000 <br />Subtotal (M): (171,276 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 5220,737 <br />II. INDIRECT COSTS <br />____________________________________________________ ________ __ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Rem Na.~ (tam Description ~ Los[ (f) <br />t. ~ Public Liability Insurance.... 1.550% of dir. ~ f3,421 <br />2. ~ Contractor's Performance Bond 0.975% of dir. I 52,152 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 522,074 <br />4. ~ Job Superintendent.. <br />Subtotal (A): f27,647 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 i P): 5248,385 <br />B. DNG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Deseri ption ~ Cost (f) <br />1. ~ Minerals Program Admin. fee et 5.00% of cntr.~ 512,419 <br />NET INDIRECT LOST PERCENTAGE: 18.15% Subtotal (B): (12,419 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A Through B): 540,067 <br />____________ <br />TOTAL PER FORMIINCE BOND AMOUNT (direct plus indirect costs): 5260,804 <br />