My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-11-09_REVISION - M2000016 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2004-11-09_REVISION - M2000016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:07 PM
Creation date
11/22/2007 1:31:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
11/9/2004
Doc Name
Exh.K thru S and Addendum 1
From
Lafarge West Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br />Reclamation Costs <br />The following represents the estimated cost for the Division to reclaim Riverbend Pit, <br />based on a maximum disturbed azea of 145 acres as detailed in the Mining Plan Exhibit, <br />page 15. <br /> <br />ITEM <br />COST/UNIT <br />UNIT TOTAL <br />UNITS <br />TOTAL COST <br />irect Cost: Earthmovin & Reve etation <br />Grass Seed Mix $39.83 Acre 40 $1,593.20 <br />Drillin Grass Seed $18.00 Acre 40 $720.00 <br />Fertilizer-40#AN&P $29.23 Acre 40 $1,169.20 <br />FertilizerA lication $12.50 Acre 40 $500.00 <br />To Soiling w/ Dozer/Loader $0.75 LCY 64,500 $48,375.00 <br />Diskin or Scarif in $28.50 Acre 40 $1,140.00 <br />Weed Control $30.00 Acre 40 $1,200.00 <br />Back Slo in $0.75 LCY 1,500,000 $1,125,000.00 <br />Conveyor Removal $14.10 Linear Foot 16,000 $225,600.00 <br />Mobilization & Demobilization $1,500.00 Lum sum I $1,500.00 <br />Com acted Liner Installation $2.25 LCY 325,000 $731,250.00 <br />Total Direct Reclamation Cost $2,138, 047.40 <br /> <br />ndirect Cost: Overhead & Pro tt <br />Public Liability Insurance 1.55% $33,139.73 <br />Contractor Performance Bond 1.55% $33,139.73 <br />Contractor Profit 10.00% $213,804.74 <br />DMG Pro'ect Administration Ex en se 5.00% $106,902.37 <br />Total Indirect Reclamation Cost $386,986.5 <br /> <br />Total Performance Bond Amount $2,525,033.9 <br />Per Acre Cost of Reclamation (145 affected acres) $17,414.03 <br />OMG Ill Permii <br />Page 59 of 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.