Laserfiche WebLink
~~ -= TerraMatrix <br />Engineering 8~ Environmental Services <br />165 S. Union Boulevard • Suite 800 <br />Lakewood, Colorado 80228 <br />303-763-5140•fax 303-985-3739 <br />March 1,1994 <br />Mr. Wallace Erickson <br />Department of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />iii iiiiiiiiiiiiiiii <br />999 <br />RECEIVED <br />MAR 2 1994 <br />Dig"'s'o~i of NlinBraiS & Gecio9Y <br />Re: Energy Fuels Mining Company (EFMC) Raton Creek Mine (Permit No. C-82-055) <br />Stipulation 11 <br />Dear Wallace: <br />Accompanying this letter is an application for Technical Revision 14 ('I'R 14) and supporting <br />material to address Stipulation I1 which states: <br />Within 180 days of permit renewal approval, the permiztee will srthmit for approval plans for <br />highwall elimination as allowed lry then regrtlatory regrtiremenu for all regulated highwalls <br />within the pennit area. These plans should facilitate review and development of site-specific <br />reclamation measures for individrurl highwall segmenu to first tneet overall reclamation <br />objectives. <br />Included in this response package are 3 copies of the following: <br />• Application Form <br />• Summary of Revisions and Additions <br />• Revised Permit Text <br />• Revised Map 17 and New Figures 17-1, 17-2, and 17-3 <br />The accompanying TR 14 should effectively address Stipulation 11. Please feel free to contact me <br />if you have any questions or require further information. <br />Sincerely <br />TerraMatrix <br />Thomas E. Leidich <br />Project Engineer <br />CC: Al Weaver <br />J. Nettleton <br />Steamboat Springs, CO • Denver, CO .Seattle, WA • Juneau, AK • Santiago, Chile SA <br />