Laserfiche WebLink
MOUNT ROYALE VENTUR F'A(it b6/06 <br />Mr. Thomas Schreiner <br />Division of Reclamation, Mining and Safety <br />Adequacy Review Comments TR-05 <br />4/10/2007 <br />Page 5 of 5 <br />The baseline for the MW-5 well will be established upon completion of the five (5) <br />quarters of water sampling, following the construction of this well. Again, Agricultural <br />groundwater quality limits will be applied until the dataset is complete. <br />C. Documentation <br />As part of this Technical Revision, MRV commits to providing a complete, stand-alone <br />document which summarizes the baseline data for all monitoring points within 30 days of <br />the acquisition of a complete dataset for each monitoring point. This document will be <br />incorporated into the M1983-141 permit for future water quality monitoring. <br />Thank you for your attention to this matter. if the Division has additional concerns, <br />please do not hesitate to contact us. <br />Sincerely, <br />~~ <br />Matt Collins <br />General Manager -Front Range Gold Project <br />Enclosure <br />Cc: Adrian Brown (via Electronic Mail) <br />