My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV105881
DRMS
>
Back File Migration
>
Revision
>
REV105881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:17:53 AM
Creation date
11/22/2007 1:30:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
12/19/2002
Doc Name
Review of December 11, 2002 Response Letter
From
DMG
To
Greystone Environmental Consultants, Inc
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman S[., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />December 19, 2002 <br />DIVISION OF <br />MINERALS <br />GEOLOGIC <br />RECLAMATION <br />MINING•SAFETY <br />Mr. K. M. Kohn Bill Owens <br />Greystone Environmental Consultants, Inc Governor <br />Greg E. Walther <br />5231 South Quebec Street Executive Director <br />Greenwood Village, CO 8011 I Ronald W. Canany <br />Acting Division Director <br />Re: Review of December 11, 2002 Responses <br />Technical Revision TR-09, Lorencito Coal Company, LLC <br />The Lorencito Canyon Mine, DMG Permit No. C-96-084 <br />Dear Mr. Kolin: <br />The Division received your letter of December 11, 2002 on December 13, 2002. We have <br />reviewed your responses, and have provided comments below. Unless otherwise noted, items are <br />listed in the order identified in our August 12, 2002 adequacy letter. As the current decision date <br />for this TR is December 20, 2002, please provide a request for an extension of the decision date. <br />17(a). The response is inadequate. It is our understanding that the information requested for Map <br />2.05.3-5 regarding the dates of installation of the coal bed methane wells and pipelines has <br />not yet been obtained from Evergreen Resources. Please provide a revised (and certified) <br />Map 2.05.3-5 that includes this information once the information is obtained. <br />Map 2.05.3-5 has been revised to exclude from the previous version of the map those as- <br />yet unapproved mining areas, fills, roads, and ponds that are being proposed under a <br />different permitting action. With the exception of the lack of information discussed in the <br />paragraph above, Map 2.05.3-5 is acceptable. <br />17(b). The response and the proposed revisions to the permit are acceptable. <br />Kent Gorham with the Division has also reviewed Greystone's revised pages 2.05-39a <br />through 2.05-39i, and discussed his remaining concerns with Greystone by telephone on <br />December 19, 2002. Please provide your responses as discussed with Kent today. Please contact <br />me if I may be of further assistance. <br />Since 'T/.,"'~ ~/ <br />U' ~ 0 <br />Darnel I. Hernandez <br />Senior Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.