My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV105826
DRMS
>
Back File Migration
>
Revision
>
REV105826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:17:48 AM
Creation date
11/22/2007 1:29:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
8/20/2007
Doc Name
Proposed Decision Letter & Forms
From
DRMS
To
National King Coal, LLC
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ <br />„~ <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />•~~~ 1313 Shemlan Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />PROPOSED DECISION <br />for <br />Approval of Permit Renewal <br />The Colorado Division of Reclamation, Mining and Safety, in accordance with C.R.S. <br />34-33-109(7), proposes to Approve with conditions the renewal of a permit to conduct surface coal <br />mining and reclamation operations at the King Coal Mine, Permit No. C-1981-035. <br />This decision is based on a review of the complete and accurate application and the existing permit, <br />including all conditions and revisions approved up to August 17, 2007. In accordance with C.R.S. <br />34-33-109(7)(a), the Division makes the following determinations which warrant that the permit be <br />renewed: <br />The terms and conditions of the valid, existing permit aze being satisfactorily met; <br />2. The present surface coal mining and reclamation operation is in compliance with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 et <br />seq., and the Regulations promulgated thereunder; <br />The renewal requested does not substantially jeopazdize the petmittee's continuing <br />responsibility on existing permit azeas; <br />4. The operator has provided evidence that the performance bond in effect for the operation <br />will continue in full force for the proposed period of renewal as well as any additional <br />bond required; <br />5. Any additional revised or updated information as required has been provided. <br />Based on a preponderance of the evidence, the permit issued to National King Coal, LLC meets the <br />requirements under the right of successive renewal. <br />The permit application will remain a binding part of the permit. Renewal of the permit will be for a <br />term of five (5) yeazs. <br />I conclude that [here is no basis for denying the renewal. <br />RECLAMATION, MINING AND SAFETY <br />e <br />M~\O55\ahdgemp\GRN-I S_C I981035_TAK_08202007010100.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.