Laserfiche WebLink
9450 <br />9,75 <br />9`300 <br />1 :3 ICS <br />0 <br />A <br />2 <br />1 <br />ice <br />7 <br />LI <br />l <br />EMBRAN <br />, <br />I c r) <br />Q v,.2 5 <br />C7 <br />10 <br />. <br />2 <br />1 <br />-r <br />if <br />1 <br />A <br />`1 <br />i <br />1 <br />4, <br />1 <br />1 <br />1 <br />♦ <br />ENGINEER'S STAMP <br />�RE <br />GEOMEM <br />50'x 1 <br />(NOTE 3) <br />♦ <br />N49000 <br />LIMITS 'OF-EXIST - INQ <br />VLF GEOMEMBRNE <br />1 Nv <br />NO. I REVISION DESCRIPTION TRIs DRAWING IS NOT APPROVED <br />UNLESS LAST REVISION IS NAND WRITTEN <br />ISSUED FOR PERMIT <br />c9 <br />LEGEND <br />EXISTING GROUND SURFACE ELEVATIONS <br />FINAL GROUND SURFACE ELEVATION <br />(TOP OF UPPER GEOMEMBRANE IN POND <br />AREAS) <br />1.5H:lV� SLOPE INDICATOR, EXPRESSED AS <br />HORIZONTAL TO VERTICAL <br />LIMITS OF TEXTURED UPPER LINER, <br />GEOMEMBRANE, TEXTURED SIDE UP; <br />PLACE ONE PANEL APPROXIMATELY <br />EVERY 4 PANELS AS SHOWN <br />EXTERNAL POND <br />SURVEY CONTROL <br />CONTROL <br />POINT <br />NORTHING <br />EASTING <br />ELEVATION <br />(SEE NOTE 1► <br />CP1 <br />48,634.87 <br />35,100.30 <br />9,417.0 <br />CP2 <br />48,768.58 <br />35,594.97 <br />9,417.0 <br />CP3 <br />48,590.16 <br />35,738.73 <br />9,417.0 <br />CP4 <br />48,344.18 <br />35,240.16 <br />9,417.0 <br />CP5 <br />48,571.10 <br />35,239.66 <br />9,377.8 <br />CP6 <br />48,476.21 <br />35,285.68 <br />9,377.7 <br />CP7 <br />48,649.34 <br />35,556.21 <br />9,375.0 <br />CP8 <br />48,626.34 <br />35,574.74 <br />9,375.0 <br />CP9 <br />48,601.45 <br />35,524.35 <br />9,375.0 <br />CP10 <br />48,638.05 <br />35,514.45 <br />9,375.0 <br />CP11 <br />48,645.08 <br />35,554.82 <br />9,373.5 <br />CP12 <br />48,627.63 <br />35,568.88 <br />9,373.5 <br />CP13 <br />48,611.91 <br />35,537.02 <br />9,373.5 <br />CP14 <br />48,638.34 <br />35,529.90 <br />9,373.5 <br />MOTES: <br />1. ELEVATION SHOWN TO TOP OF UPPER GEOMEMBRANE <br />LINER. <br />2. POND PROVIDES TOTAL CAPACITY OF 20 MILLION GALLONS <br />TO EL. 9,414.0 CREST ELEVATION OF 9,417.0 INCLUDES <br />3 FEET OF FREEBOARD. <br />3. ROAD WIDTH MAY BE MODIFIED DURING CONSTRUCTION AS <br />APPROVED BY OWNER. <br />4. BASE TOPOGRAPHY PROVIDED BY WESTERN STATES SURVEYING <br />INC.; BASED ON AS— BUILTS FOR PHASE I & II AND FEB. 1998 <br />SURVEY FOR ALL OTHER AREAS. <br />5. SEE DRAWING 3 FOR PLAN LOCATIONS OF CONTROL POINTS <br />11, 12, 13, AND 14. <br />RECEIVED <br />APR 10 20 <br />i t <br />1 S Di <br />t gIS10110f�1jIpB E �y_, <br />NORTH <br />1 <br />Scale in Feet <br />Permit# <br />Date: dDO 0 25 50 100 <br />Doc Nalne See Map 1" = 50 feet Illlillllill!illliilllllil <br />Origin: ry/ - �9 5' CONTOUR INTERVAL <br />19651 <br />DATE BY CHKD AP'VD fir- c- Cripple Crook & VIctor GWd GAIn:n$ Company <br />Cresson Project <br />A Joint Venture — AngloGold (Colorado) Corp., Manager <br />ITME PHASE I/C/r <br />EXTERNAL PAD GRAM01 PLAIN <br />200 <br />90228 <br />CREC® BN <br />REVIEWED RAB <br />1PPROVED JFL <br />SCALE 1"=50' <br />ME No. 2099DO30 <br />MARCH 2000 <br />NO. 993 -2099 <br />PAL NO. D030 <br />1I L <br />