Laserfiche WebLink
<br />D~dash <br />Page 3 <br />January 19, 1999 <br />mine. The potential for discharge from the portals (once mining has ceased)should be <br />evaluated and included in the PHC portion of the revised text. The Hydrologic Reclamation <br />Plan states that no hydrologic reclamation plan is proposed for potential mine discharge. <br />Permanent entry seals are proposed for the mine portals. If a perpetual discharge situation <br />arises, how will rnine dischazge be conveyed from the mine? "fhe Hydrologic Keclamation <br />Plan should provide additional detail on how the discharge (if it occurs) will be conveyed, <br />handled, and treated prior to discharge. <br />Larry Routten <br />