Ms. Deb G6nima <br />August 11, 2006 <br />Page 2 of 3 <br />The following addresses comments made by Tom Schreiner of the DMG in his July 5, <br />2006 letter to you and Carl Mount: <br />1. Reference attached memorandum from Carroll & Lange, dated August 9, 2006. <br />Tab 3 <br />2. Reference attached letter from Terracon Consulting Engineers and Scientists <br />dated July 31, 2006. Tab 4 <br />3. Groundwater Monitoring Plan <br />a. The Operator commits to implement the proposed groundwater <br />monitoring plan to assess changes in water level elevations due to the <br />slurry wall installation. <br />b. Reference attached memorandum from Carroll & Lange dated August 9, <br />2006. Tab 3 <br />c. Reference attached memorandum from Applegate Group, Inc. dated July <br />31, 2006. Tab 5 <br />d. Reference attached memorandum from Applegate Group, Inc. dated July <br />31, 2006. Tab 5 <br />e. No response required. <br />f. Reference attached memorandum from Applegate Group, Inc. dated July <br />31, 2006. Tab 5 <br />g. The Operator will submit a request to the DMG to discontinue the <br />groundwater monitoring program after 12 months if sufficient data to <br />demonstrate that groundwater monitoring is no longer needed at the <br />site. <br />3. Reference attached memorandum from Applegate Group, Inc. dated July 31, <br />2006. Tab 5 <br />4. Reference attached memorandum from Carroll & Lange dated August 9, 2006. <br />Tab 3 <br />5. Reference attached letter from Terracon Consulting Engineers and Scientists <br />dated July 31, 2006. Tab 4 The Operator commits to providing revised maps <br />and engineering designs for any significant changes required due to the <br />unforeseen field conditions. <br />G:{381113811-OMG Pennrtl2nd AtleQUacy Rvw ftespons13811 2nd Rvw Response Letter OMG.doc <br />