Laserfiche WebLink
5 <br />(8) The lessee st~a11 provide for the suppression and control of fugitive dust <br />on roads used by the lessee. <br />(9) The lessee will be required to comply with BLM stipulations regarding <br />transport of coal from the lease. <br />(10) The lessee shall be required to perform a study to secure adequate <br />baseline data to quantify existi.ng~ surface resources on and adjacent to the lease <br />area. Existing data may be used if such data are adequate for the intended <br />purposes. The study shall be ac`Eequate to locate, quantify and demonstrate the <br />interrelationship of t:he geology, topography, surface hydrology, soils, vegetation <br />and wildlife, Baseline data will be established so that future programs of <br />observation can be incorporated at regular intervals for comparison. <br />{11) The lessee shall be required to establish a monitoring system to locate, <br />measure, and quantify any progressive and final effects of underground mining <br />activities on the topographic surface, subsurface and surface hydrology, soils and <br />vegetation. The monitoring system shall utilize techniques which will provide a <br />continuing record of change over time and an analytical method for location and <br />measurement of a number of points over the lease area. <br />(12) The licensee/permittee/lessee must comply with all the rules and <br />regulations of the Secretary of Agriculture set forth at Title 36, Chapter II, of <br />the Code of Federal Regulations governing the use and management of the National <br />Forest System (NFS) when not inconsistent with the rights and regulations must be <br />complied with for (a) all use and occupancy of the NFS prior to approval of a <br />permit/operation plan by the Secretary of the Interior, (b) uses of all existing <br />improvements, such as Forest Development Roads, within and outside the area <br />licensed, permitted or leased by the Secretary o£ the Interior, and (c) use and <br />occupancy of the NFS not authorized by a permit/operating plan approved by the <br />Secretary of the Intex'i or. <br />All matters related to this stipulation are to be addressed to: <br />Forest Supervisor <br />Grand Mesa, Uncompahgre and Gunnison National Forests <br />2250 Highway 50 <br />Delta, CO 81416 <br />who is the authorized representative of the Secretary of Agriculture. <br /> <br />Signature of llicensee7permittee/lessee -. <br />";> <br />