My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV105692
DRMS
>
Back File Migration
>
Revision
>
REV105692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:17:34 AM
Creation date
11/22/2007 1:28:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/9/2007
Doc Name
Decision Memo for Geotechnical Borehole
From
USDA-FS
To
Bowie Resources, LLC
Type & Sequence
MR75
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />and Wildlife Service (USFWS) protocol; <br />(ii) Provide the results of all surveys to the USFWS, the Uncompahgre Field <br />Office of BLM and the Pa onia Ranger District of the USFS; <br />(iii) If suitable habitat or individuals are located in L-he area, <br />consultation with the USFWS will be required to determine suitable conservation <br />measures to prevent a "take" under section 9 of the Endangered Species Act. <br />Conservation measures may include avoidance of the occupied habitat, establishment <br />of a buffer zone and seasonal restriction around occupied habitat, or others <br />developed for~the specific site. 1n accordance with current protocol, surveys for <br />the presence of the species are valid for only .one year. <br />(c) Wildlife. (2) Raptors. (A) With respect to bald or golden eagle nests <br />which may be established on the Iron Point lease during the life of the project, the <br />following shall apply: <br />(i) No new permanent surface facilities or disturbances shall be located <br />within a 1/4 mile radius buffer zone around each bald or golden eagle nest site. <br />(ii) No above ground activities will be allowed within a 2 mile radius buffer <br />zone around each active eagle nest site from November 15 to July 30 for bald eagles, <br />and around each active golden eagle nest site from February 1 to July 15. <br />(iii) Any proposed surface facilities, disturbances or activities (noted <br />above) in, or adjacent to, these buffer zones will require approval from the BLM or <br />USFS on a site-specific basis, after consultation with the USFWS. <br />(B) With respect to bald eagle winter roost sites or concentration areas <br />which may become established on the iron Point lease during the life of the project, <br />the following special stipulation shall apply: <br />(i) No above ground activities will be allowed within a 1/4 mile radius of <br />winter roosts between November 15 and March 15; development may be .permitted at <br />other periods. If periodic visits are required within the buffer zone after <br />development, activity should be restricted to the hours of 10 a.m. and 2 p.m. from <br />November 15 through March 15. <br />(C) With respect to other raptors (except American Kestrel} which may occur <br />or become established on the Iron Point lease during the life of the project, the <br />following special stipulation shall apply: <br />(i) Conduct surveys for nesting raptors on the lease tract prior to <br />development of any surface facilities. No surface activities will be allowed within <br />2 mile radius of active nest sites between the dates of February 1 and August 15, <br />unless authorized by BLM or USFS on a site specific basis. <br />(2) Bio Game Winter Ranae. (A) With respect to mule deer and elk crucial <br />winter range that may be established by Colorado Division of Wildlife (CDOW) on BLM <br />managed lands on the Iron Point lease during the life of the project, the following <br />shall apply: <br />(i) Coal related facilities and surface disturbances except subsidence will <br />be authorized in the review area only if no practical alternatives exist. The BLM <br />will coordinate with the CDOW to determine the type and extent of allowable <br />variances. Coal exploration, facility constructiory, and major .scheduled maintenance <br />will not be authorized within these crucial winter ranges from December 1 through <br />April 30. All unavoidable surface disturbances within these crucial winter ranges <br />during these times will require approval of the authorized officer. <br />(d) Water. (1) Water Reulacement Plan. (A) Lessee shall replace in a manner <br />consistent with state law the water supply of any owner of a vested water right <br />which is proximately injured as a result of the mining activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.